Download Print this page

Jaypro FSG67910 Assembly Instructions page 2

Futsal goal

Advertisement

1) UNPACK ALL PARTS AND CHECK AGAINST PARTS LIST TO ENSURE THAT ALL PARTS
HAVE BEEN INCLUDED
2) INSPECT FOR DAMAGE. REPORT ALL DAMAGES TO TRUCKING COMPANY.
3) LAY PARTS OUT ON CLEAN DRY FLOOR AS SHOWN IN FIGURE 1
4) ASSEMBLE CORNER (ITEM 7) WITH UPRIGHT (ITEM 4) DO NOT ADD HARDWARE AT THIS
TIME. SEE DETAIL A
5) INSTALL END CAP USING RUBBER MALLET TO BOTTOM BACKSTAY (ITEM 1 & 2) SEE
B
DETAIL B
6) ASSEMBLE THE BACKSTAY (ITEM 6) INTO THE HUB OF THE CORNER FITTING (ITEM 7)
USING 2-1/2" LONG SCREW
7) ASSEMBLE BOTTOM BACKSTAY (ITEM 1) TO ASSEMBLED CORNER AND UPRIGHT. SEE
DETAIL C, DO NOT ADD HARDWARE
8) WITH THE HELP OF A SECOND PERSON ASSEMBLE THE BACKSTAY (ITEM 6) YOU MAY
NEED TO LIFT UP ON THE BOTTOM BACKSTAY TO FIT TOGETHER. NOW ADD THE BOLTS,
WAHSERS OR NUTS AS SHOWN IN DETAILS A, C, AND D; DO NOT TIGHTEN HARDWARE
COMPLETELY YET
9) REPEAT STEPS 4, 5, 6 AND 7 TO ASSEMBLE UPRIGHT ON OPPOSITE SIDE
10) SLIDE TOP CROSSBAR (ITEM 5) INTO CORNER AND INSTALL HARDWARE SHOWN IN
DETAIL E, DO NOT TIGHTEN BOLTS COMPLETELY.
11) ASSEMBLE OPPOSITE UPRIGHT TO CROSSBAR WITH HARDWARE SHOWN IN DETAIL E
AND AGAIN DO NOT TIGHTEN BOLTS COMPLETELY
12) WITH THE HELP OF A SECOND PERSON ASSEMBLE THE SQUARE BOTTOM CROSSBAR
(ITEM 3) TO THE BOTTOM BACKSTAYS USING HARDWARE SHOWN. SEE DETAIL F AGAIN
DO NOT TIGHTEN THE HARDWARE COMPLETELY.
13) CUT AND APPLY ANTI-SKID PAD TO BOTTOM SURFACES OF UPRIGHT, BOTTOM
BACKSTAYS AND SQUARE BOTTOM CROSSBAR.
14) WITH THE HELP OF A SECOND PERSON STAND THE GOAL UP-RIGHT
15) SQUARE THE FRAME AND TIGHTEN ALL HARDWARE. START BY ALIGNING THE
CORNER PIECE WITH THE UPRIGHT EXTRUSION AND CLOSING ANY GAP BETWEEN THE
CORNER AND THE UPRIGHT. NOW TIGHTEN THE TWO SCREWS FURTHEST FROM THE
CORNER HUB. ONCE THEY ARE SECURE YOU CAN TIGHTEN THE BOLT CLOSEST TO THE
CORNER HUB. FOLLOW THIS SAME PROCEDURE FOR SECURING THE CROSSBAR TO THE
CORNER PIECE. ONCE THE CORNERS ARE SECURED THE REST OF THE GOAL
HARDWARE CAN BE TIGHTENED DOWN.
16) LAYOUT NET AND IDENTIFY CORNERS. DRAPE NET OVER OR UNDER FRAME AND
ATTACH USING VELCRO STRIPS CUT AT 12 INCHES LONG EACH AND SPACED
A
APPROXIMATLEY 12 INCHES APART
AS AN OPTION
17) TO MINIMIZE THE AMOUNT OF SAG
ACROSS THE BACK OF THE NET, WEAVE THE
CORD (SUPPLIED WITH THE ASSEMBLY KIT)
THROUGH THE MESH AND SECURELY TIE IT
OFF ALONG THE CORNER ELBOW OF EACH
BACKSTAY.
2
FSG67910 FUTSAL GOAL
ASSEMBLY INSTRUCTIONS
2
PHONE:
800.243.0533 (TOLL FREE)
860.447.3001 (LOCAL)
JAYPRO SPORTS, LLC, 976 HARTFORD TURNPIKE, WATERFORD, CT 06385 USA
www.jaypro.com
DESCRIPTION
FUTSAL GOAL CUSTOMER ASSEMBLY INSTRUCTIONS
PART NUMBER
FSG67910
SIZE
SCALE
DATE
A
N/A
3/25/2011
THIS DRAWING IS THE SOLE PROPERTY OF JAYPRO SPORTS INC. AND MAY
NOT BE REPRODUCED WITHOUT WRITTEN PERMISSION OR CONSENT
1
FAX:
860.444.1779 (SALES)
860.440.0628 (ENG.)
DWN BY
CHKD BY
DONL
WVB
REV
SHEET
2
OF
5
A
1
B
A

Advertisement

loading