ASSEMBLY INSTRUCTIONS
6. Tie all the ties around the bars. Take the straps and
pass them underneath the bars, pull up and tighten
through each metal buckle.
7. Use (L) elastics and S hooks to close the door.
Hardware Used
L
Elastic+S-Hook
8. Place the Floor Bracket (M) at each end of the shelter.
Then drive in nails (N) into ground, gravel or asphalt.
Hardware Used
M
Floor Bracket
N
Nail
6
7
x 40
8
x 4
x 8
Page 8