Download Print this page

Daikin Modular T Installation Manual page 6

Pre-heating water coil
Hide thumbs Also See for Modular T:

Advertisement

3
Example of installation of the Pre-heating water coil both horizontally and vertically
4
Installation of Pre-heating water coil
6
Pre-heating water coil can be positioned both
horizontally
and vertically.
The ducts and the pre-heating coils must be
permanently fixed to a fixed structure
example a wall or a ceiling) using brackets (not
supplied).
Pre-heating water coil should be installed in
such a way that it is accessible for maintenance
or any other operation.
Pre-heating water coil with gaskets
already inserted
coupling not provided
(provide for sealing gaskets)
see fig. 1 for the correct lenght and diameter
unit spigot with gasket already inserted
(for

Advertisement

loading

This manual is also suitable for:

Atd03hwfauAtd04hwfauAtd05hwfauAtd06hwfauAtd07hwfau