Walnut Ridge
Cabinetry
®
You Will Need:
Screwdrivers, Protected Surface to Assemble Cabinet On
STEP 1: Attach side panel to back panel.
STEP 2: Attach top panel to back panel and side panel.
STEP 3: Attach remaining side panel and bottom panel.
STEP 4: Attach face frame.
STEP 5: Install shelves.
STEP 6: Adjust door spacing as needed. Add bumpers.
PARTS LIST
NO.
Description
A
Side Panel
B
Back Panel
C
Top & Bottom Panels
D
Face Frame
E
Adjustable Shelf
F
Door(s)
HARDWARE
3/4" Round
Hinge
Bumper
Head Screw
9/16" Round
Male/Female
Shelf Clip
Head Screw
Clips
1" Flat
Head Screw
50 Aberdeen Drive, Glasgow, KY 42141 | Phone: 270-361-2772 | Fax: 270-361-2771
Email: Orders@BrokeringSolutions.com
SUBJECT TO CHANGE
STANDARD WALL CABINET
Assembly Instructions
STEP 1
A
B
STEP 4
D
A
C
A
C
30" and 36" Tall
*Door and shelf configuration may vary based on cabinet size.
STEP 2
A
C
B
STEP 5
C
D
E
A
42" Tall
STEP 3
A
C
C
A
STEP 6
C
F
E
A
D
Brokering Solutions
CABAMBD 031623 | REV 3-16-23
Need help?
Do you have a question about the Walnut Ridge Cabinetry STANDARD WALL CABINET and is the answer not in the manual?
Questions and answers
What dimensions are the shelf clips, as I need to buy more.
The dimensions of the shelf clips for the Brokering Solutions STANDARD WALL CABINET are 9/16”.
This answer is automatically generated