Name Of Parts; Before Installation; Installation - Hitachi P-N23NA2 Installation And Operation Manual

Air panel
Hide thumbs Also See for P-N23NA2:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 11

NAME OF PARTS

4 NAME OF PARTS
Air panel P-N23NA2 /
P-AP160KA3

5 BEFORE INSTALLATION

5.1 FACTORY-SUPPLIED ACCESSORIES
!
C A U T I O N
When the air panel is unpacked, place it on insulation material, etc. to
protect the sealing insulation from scratches.
Check to ensure that the accessories are packed with the air
panel.

6 INSTALLATION

6.1 CHECK THE INDOOR UNIT HEIGHT FROM THE FALSE CEILING SURFACE
Check the distance between the indoor unit and the false ceiling.
It is 12+5mm as shown below.
3
PMML0569 rev.0 - 01/2021
Air inlet grille
Indoor unit
+5
12
0
Ceiling surface
Air inlet
Air outlet
Accessory
Long Screw
(M6 Cross
Screw)
If any of these accessories are not packed in the packing,
please contact your contractor.
If not, adjust the distance by using the checking scale with
maintaining the levelness of the indoor unit.
Cover for corner pocket
P-N23NA2
Purpose
P-AP160KA3
4
For fixing air panel

Advertisement

Table of Contents
loading

This manual is also suitable for:

P-ap160ka3

Table of Contents