Page 1
INSTALLATION GUIDE C AR G O B AR R I E R F O RD E X P E D I T I O N S TA N DA R D A N D E L S T R O N G R E L I A B L E S E C U R E pro-gard.com...
Page 2
THESE COMPONENTS ARE REQUIRED TO INSTALL THE PRO-GARD BARRIER SYSTEM 4B58EXPD09A HARDWARE/WING KIT 3B300X BARRIER Refer to the diagram on the last page of these instructions to verify all parts were received. The following tools will be required to complete the installation.
Page 3
FIG. 2 E. Attach the lower mounting brackets to the DRIVER’S SIDE SHOWN Barrier using the Phillips head bolts (3X05A) and whiz nuts (3X16) through the existing holes in the Barrier. See Fig. 2 F. Attach the Polycarbonate top panel (3P723-B) to the Barrier using the exsiting bolts from the top of the barrier window frame.
Page 4
4BHK5809 Third than a quotation to or an order from ITEM PART NUMBER DESCRIPTION Angle Pro-Gard Products without the specific MATERIAL: Projection 3X05A 1/4-20 X 7/8 PHIL TRUSS HD MS written authorization of Pro-gard Products. 3X16 1/4-20 HEX WHIZ NUT - BLACK...
Need help?
Do you have a question about the 3B300X and is the answer not in the manual?
Questions and answers