Football scoreboard with mp-5000r control (22 pages)
Summary of Contents for Everbrite Electronics All American Scoreboards MP-3424R
Page 1
Operating Instructions & Service Manual HOME HOME HOME GUEST GUEST GUEST T . O. T . O. DOWN BALL ON TO GO LEFT LEFT Football Scoreboard Model MP-3424R With MP-3000R Control EFFECTIVE S.N. 18,200 July 25, 2002...
TABLE OF CONTENTS PAGE GENERAL INFORMATION DESCRIPTION IDENTIFICATION DAMAGE DAMAGE CLAIM PROCEDURE INSTALLATION GENERAL INFORMATION INSTALLATION ELECTRICAL CONNECTIONS CONTROL CONSOLE OPERATION SCOREBOARD POWER CONSOLE DISPLAY CONSOLE POWER INITIALIZING SCOREBOARD TIME SETTING AND CONTROL TEAM SCORES HORN (OPTIONAL) YARDS TO GO, BALL ON, DOWN, QUARTER, AND TIME OUTS LEFT DIMMER 3.10 TRACK OPERATION...
GENERAL INFORMATION 1.1 Description Your All American Scoreboard has been carefully inspected and tested before leaving the factory. It is possible, however, that components may be loosened or forced out of adjustment in transit. If this occurs, follow the troubleshooting guide (section 4). If equipment then fails to operate, contact immediately: ALL AMERICAN Service Department EVERBRITE Corporation P.O.
If damage is discovered after delivery, you should call the delivery company. Have them make out a Concealed Damage Report. Fifteen days after delivery are allowed, so this should be done PROMPTLY or it is impossible to process this claim. Advise EVERBRITE corporation of necessary replacement parts or repairs.
2.3 Electrical Connections The MP-3424R scoreboard requires two 120 V. 30 AMP AC circuits. This can be accomplished by a 120 volt single phase 2 wire with ground 60 amp service or a 120/240 volt single phase three wire with ground 30 amp service.
3.4 Initializing Scoreboard Enter the two digit code (61) shown in the lower left corner of the keyboard as in the following example: Push CODE 6 1 ENTER . When the proper code has been entered, the console display will show as follows: The scoreboard display will now show :00 in the time section.
The horn will blow automatically at the end of each period for 2 seconds. The automatic horn function may be disabled by using the AUTO HORN key. An ‘H’ is displayed on the LCD when this function is enabled. 3.8 Yards To Go, Ball On, Down, Quarter, and Time Outs Left Entries to the above function is made in the same manner as direct entry for Team Scores.
MAINTENANCE AND TROUBLESHOOTING 4.1 Introduction This section gives maintenance and troubleshooting information. Included are troubleshooting guides for typical scoreboard malfunctions. If the cause of a problem cannot be determined, please contact the Customer Service Department. 4.2 Test Equipment A simple analog or digital voltmeter will be sufficient for all user repairable problems. Printed circuit boards requiring troubleshooting should be returned to the factory.
Page 9
If the continuity test checks good, check the voltage between the green wire and the white wire in the junction box, using a voltmeter set on the 12 VAC or higher scale. If the voltage is 0 VAC see the controller parts list for a transformer assembly. If the voltage is less than 8 VAC consult the controller wiring diagram for instructions on long cable compensation.
REPLACEMENT PARTS 5.1 Scoreboard Display Parts figure 1 DISPLAY ASSEMBLY s:\shared\stacey\scoreboard manuals\incomplete manuals\mp-3424r.indd 401 South Main Street • Pardeeville, WI 53954 • 800-356-8146 07/31/02...
Page 11
REPLACEMENT PARTS LIST (MP-3424R Football) fig.& MFG PART VENDOR fig.& MFG PART VENDOR index NUMBER DESCRIPTION PART # index NUMBER DESCRIPTION PART # 151090 Display Set 151090 850022 Lamp, 15W/130V Clear 15A15CL 1-1A 850026 Lamp, 25W/130V I.F. 25A15IF 151213 Controller Assembly, MP-3424R 151213 *****SEE DETAIL FIGURE 2***** SU00038...
5.2 Scoreboard Controller Assembly Parts figure 2 CONTROLLER ASSEMBLY REPLACEMENT PARTS LIST (MP-3424R) Controller Assembly fig.& MFG PART VENDOR fig.& MFG PART VENDOR index NUMBER DESCRIPTION PART # index NUMBER DESCRIPTION PART # 151213 Controller Assembly 151213 150040 Receiver PCB Assy, 11.0592 MHZ crystal 150040 *** PROGRAM 3432.CNTW *** 118922...
DIAGRAMS 6.1 Control Console Keyboard and Slipsheet Layout FOOTBALL TRACK CONSOLE KEYBOARD s:\shared\stacey\scoreboard manuals\incomplete manuals\mp-3424r.indd 401 South Main Street • Pardeeville, WI 53954 • 800-356-8146 07/31/02...
6.2 Power Wiring POWER WIRING s:\shared\stacey\scoreboard manuals\incomplete manuals\mp-3424r.indd 401 South Main Street • Pardeeville, WI 53954 • 800-356-8146 07/31/02...
6.3 Controller Assembly Wiring CONTROLLER ASSEMBLY s:\shared\stacey\scoreboard manuals\incomplete manuals\mp-3424r.indd 401 South Main Street • Pardeeville, WI 53954 • 800-356-8146 07/31/02...
Page 16
6.4 Microprocesor 4 X 7 Lamp Pattern (8 Bit) MICROPROCESSOR 4 X 7 (8 BIT) LAMP PATTERN s:\shared\stacey\scoreboard manuals\incomplete manuals\mp-3424r.indd 401 South Main Street • Pardeeville, WI 53954 • 800-356-8146 07/31/02...
Page 17
6.5 Figuregram Wiring 8 BIT FIGUREGRAM WIRING s:\shared\stacey\scoreboard manuals\incomplete manuals\mp-3424r.indd 401 South Main Street • Pardeeville, WI 53954 • 800-356-8146 07/31/02...
6.7 Jumper Location on 3 Position System All of the 3 position drivers and receivers are identical except for the jumper on each board. Make sure the jumpers are set for the model of scoreboard you are installing them into. On the receiver board (refer to figure 11);...
Page 19
6.8 Triac Placement The triac is the switch that controls the figuregram lamps. The triacs for any given figuregram are adjacent to the twelve pin connector on the driver board that controls that figuregram. Shown below is the triac placement and bit designation relative to the figuregram bit pattern. PN.
Page 20
6.9 Installation Drawing 1/2-13 X 1" LG. BOLT, NUT, & L.W. 1/2-13 X 1 1/2" LG SCOREBOARD FACE BOLT, NUT, & L.W. 24' 3/4" 6' 8 3/16" 10' 4" 6' 8 3/16" 3/16 X 2 X 24" STEEL BAR (4) 3/8" (10) #10 X 1/2"...
Page 21
6.9 Installation Drawing SCOREBOARD FACE 24' 3/4" 6' 8 3/16" 10' 4" 6' 8 3/16" 8' 1/2" 8" X 18.4 lb/ft X POWER AND STRUCTURAL STEEL I BEAM CONTROL 15' 1/2" CABLE ENTRANCES WATER TIGHT NON-FUSABLE DISCONNECT SWITCH (FURNISHED 7'-0" BY OTHERS) GRADE LINE...
Page 22
6.9 Installation Drawing SCOREBOARD FACE FOR LAG SCREWS PRE-DRILL 3/8" D. HOLES 3" DEEP 1/2" X 3" LONG 6" x 14" LAG SCREWS TIMBER SCOREBOARD FACE SCOREBOARD FACE WOOD POWER SCOREBOARD FACE POLE 1/2"-13 X 1 1/2" 1/2" DIA. 1/2"-13 X 1 1/2" 8"...
Page 23
6.9 Installation Drawing 2" X 2" X 4" MOUNTING CLIPS SUPPLIED WITH SCOREBOARD "I" BEAM BACK OF SCOREBOARD CLIP ALREADY 1/2" DIA. NUTS, MOUNTED ON BOLTS, & WASHERS BACK OF SCOREBOARD INSTALLATION DRAWING s:\shared\stacey\scoreboard manuals\incomplete manuals\mp-3424r.indd 401 South Main Street • Pardeeville, WI 53954 • 800-356-8146 07/31/02...
Need help?
Do you have a question about the All American Scoreboards MP-3424R and is the answer not in the manual?
Questions and answers