Download Print this page

Advertisement

Quick Links

This instructional manual is only intended for use by a qualified service professional or authorized Noritz
Service Representative. Any unauthorized use of this manual may result in voiding the warranty.
Contact Noritz Technical Support (866-766-7489) for additional support.
FADK109
Rev. 06/17
Heat Exchanger Replacement
EZ98 (EZTR50) [GQ-C2859WX-FF US]
EZ111 (EZTR75) [ GQ-C3259WX-FF US]
NCC199CDV [GQ-C3259WZ-FF US]
NRCB180DV [GHQ-C2801WX-FF US]
NRCB199DV [GHQ-C3201WX-FF US]
Noritz America Corporation
11160 Grace Avenue, Fountain Valley, CA 92708
Phone 866-766-7489 Fax 714-241-1196
Page 1

Advertisement

loading

Summary of Contents for Noritz EZ98

  • Page 1 NRCB180DV [GHQ-C2801WX-FF US] NRCB199DV [GHQ-C3201WX-FF US] This instructional manual is only intended for use by a qualified service professional or authorized Noritz Service Representative. Any unauthorized use of this manual may result in voiding the warranty. Contact Noritz Technical Support (866-766-7489) for additional support.
  • Page 2 Heat Exchanger Replacement Procedure Procedure 1. Drain the unit as shown in following procedure for EZ111DV/EZ98DV or NCC199CDV (Refer to page 3 for NRCB199DV/NRCB180DV.) Drainage using the Remote Controller Manual Draining * RC-7651M * RC-9018M NCC199CDV Drain Plug (2) Drain Plug (1) Drain Plug (3) ≪...
  • Page 3 Heat Exchanger Replacement Procedure Procedure 1. Drain the unit as shown in following procedure for NRCB199DV/NRCB180DV (Refer to page 2 for EZ111DV/EZ98DV or NCC199CDV.) Drainage using the Operation Panel Manual Draining Page 3...
  • Page 4 Heat Exchanger Replacement Procedure Procedure Diagram 2. Remove Front Cover EZ111DV/EZ98DV or NCC199CDV (1) Disconnect electrical power to the unit. (2) Remove 4 screws w/ washer(M4×12). NRCB199DV/NRCB180DV 3. Remove ground wires (1) Remove 2 ground wires. e.g. EZ111DV (2) Remove the screws(M4×12)* that hold Circuit Board. * EZ111DV/EZ98DV or NCC199CDV: 3 screws NRCB199DV/NRCB180DV: 2 screws EZ111DV/EZ98DV or NCC199CDV...
  • Page 5 Heat Exchanger Replacement Procedure Procedure Diagram 4. Unplug all wires that attach to Wiring Harness e.g. EZ111DV (1) Unplug Flame Rod. Hold this part of the figure by the finger and remove the plug. (2) Only EZ111DV/EZ98DV or NCC199CDV Unplug remote control connector. (3) Only EZ111DV/EZ98DV or NCC199CDV Unplug Thermistor.
  • Page 6: Overall View

    Heat Exchanger Replacement Procedure Procedure Diagram (5) Only EZ111DV/EZ98DV or NCC199CDV Remove Cable Ties, unplug 6 Freeze Prevention Heaters, Water Servo - Bypass, Gas Valve Thermistor - Primary Heat Exchanger Inlet, High Limit Switch. (EZ111DV/EZ98DV) (NCC199CDV:2 High Limit Switches. ) EZ111DV/EZ98DV or NCC199CDV (6) Unplug Igniter.
  • Page 7 Heat Exchanger Replacement Procedure Procedure Diagram 5. Remove Pipes for EZ111DV/EZ98DV or NCC199CDV (Refer to page 8 for NRCB199DV/NRCB180DV.) NCC199CDV ONLY ○NCC199CDV ONLY (1) Remove 2 "C" Clamps, Pipe - Primary SS HEX to Drain Water Connection. ○EZ111DV/EZ98DV & NCC199CDV EZ111DV / EZ98DV NCC199CDV (2) Remove 2 "C"...
  • Page 8 Heat Exchanger Replacement Procedure Procedure Diagram 5. Remove Pipes for NRCB199DV/NRCB180DV (Refer to page 7 for EZ111DV/EZ98DV or NCC199CDV.) (1) Remove 4 "C" Clamps, Pipe - T-Elbow to Relief Valve Connection, Pipe - T-Elbow to Distribution Valve - Heating and T-Elbow.
  • Page 9 Heat Exchanger Replacement Procedure Procedure Diagram 6. Remove Fan Motor and Venturi assembly (1) Remove "C" Clamp. Then remove the 4 screws(M5×12) with a Long Philips screwdriver. Do not use a power drill. EZ111DV/EZ98DV or NCC199CDV (2) Pull up Fan Motor and Venturi assembly. (3) Tilt Fan Motor and Venturi assembly.
  • Page 10 Heat Exchanger Replacement Procedure Procedure Diagram 7. Remove the heat exchanger assembly from Case (1) Remove Hose Clamp, pull Drain Hose - SS HEX off. (2) Remove 4 screws(M4×12), NRCB199DV/NRCB180DV EZ111DV/EZ98DV or NCC199CDV pull Exhaust Flue off. Discard these screws. (3) Remove 8 screws(M4×10) fixing heat exchanger assembly.
  • Page 11 Heat Exchanger Replacement Procedure Procedure Diagram Mounting Plate (4) Only NRCB199DV/NRCB180DV -Circuit Board Remove 2 screws(M4×12) and Mounting Plate-Circuit Board from Exhaust Duct. (5) Remove 2 screws(M4×12) on the back of Exhaust Duct. e.g. EZ111DV (6) Remove 15 screws(M4×12) on the bottom of Exhaust Duct.
  • Page 12 Heat Exchanger Replacement Procedure Procedure Diagram 10.Separate Primary SS HEX and Burner Chamber (1) Remove 6 screws(M4×10) to remove Mounting Plate - Chamber. (2) Remove 8 screws(M4×18) to separate Primary SS HEX and Burner Chamber. (3) Separate Primary SS HEX and Burner Chamber. ※Put Burner Chamber so that the burner face faces upward.
  • Page 13 Heat Exchanger Replacement Procedure Procedure Diagram 11.Replace Primary SS HEX (1) Attach Water Connector - Elbow and "C" Clamp to new Primary SS HEX. In that case, exchange O ring - High Temp P16 of Water Connector - Elbow for a new one. (NCC199CDV ONLY) Attach Pipe - Primary SS HEX Connection with 2 "C"...
  • Page 14 Heat Exchanger Replacement Procedure Procedure Diagram (2) Join Primary SS HEX and Burner Chamber with e.g. EZ111DV 8 screws(M4×18). When tightening is over, please check again Recheck looseness for looseness of screws (3) Attach Mounting Plate - Chamber to Burner Chamber. 13.Assemble Primary SS HEX and new Secondary SS HEX (1) Replace new Gasket - Secondary Heat Exchanger with a new one.
  • Page 15 Heat Exchanger Replacement Procedure Procedure Diagram 14. Exhaust Duct Replacement (1) Put the heat exchanger assembly upside down on something with the height of 6 inch (150 mm) or more. Without support, the chamber and Exhaust Duct can be damaged. (2) Set Gasket-Exhaust Duct to match the line inside the secondary heat exchanger.
  • Page 16 Heat Exchanger Replacement Procedure Procedure Diagram (5) Fix the secondary heat exchanger and Exhaust Duct with 2 screws(M4×12) from the backside. e.g. NRCB199DV 15.Attach parts to heat exchanger (1) Attach Mounting Plate - Igniter with 2 screws(M4×8). Plug Cover (2) Plug Ignition Plug. In that case, replace new Plug Cover of Ignition Plug with a new one.
  • Page 17 Heat Exchanger Replacement Procedure Procedure Diagram 16. Fix the heat exchanger assembly in the case (1) Fix the heat exchanger assembly in the case with 8 screws(M4×10). (2) Put Drain Hose - SS HEX into the drain outlet of Exhaust Duct and fix it with Hose Clamp. Heat exchanger assembly connection enlarged view e.g.
  • Page 18 Heat Exchanger Replacement Procedure Procedure Diagram (3) Replace the O-Ring of Exhaust Flue with new one. (4) Attach Exhaust Flue to the case with 4 new screws(M4×12). e.g. EZ111DV 17. Attach Fan Motor and Venturi assembly (1) Attach the Fan Motor and Venturi assembly. Attach "C"...
  • Page 19 Heat Exchanger Replacement Procedure Procedure Diagram 18. Attach Pipes for EZ111DV/EZ98DV or NCC199CDV (Refer to page 17 for NRCB199DV/NRCB180DV.) EZ111DV / EZ98DV & NCC199CDV ○EZ111DV/EZ98DV & NCC199CDV (1) Put Pipe - Water Servo - Main in Secondary SS HEX and fix it with "C" Clamp. EZ111DV / EZ98DV ○EZ111DV/EZ98DV &...
  • Page 20 Heat Exchanger Replacement Procedure Procedure Diagram 18. Attach Pipes for NRCB199DV/NRCB180DV (Refer to page 19 for EZ111DV/EZ98DV or NCC199CDV.) (1) Put Pipe - Pump Outlet - Elbow to Secondary SS HEX and fix it with 2 "C" Clamps. (2) Attach Pipe - T-Elbow to Relief Valve Connection, T-Elbow and Pipe - T-Elbow to Distribution Valve - Heating with 4 "C"...
  • Page 21 Heat Exchanger Replacement Procedure Procedure Diagram 19. Plug all wires that attach to Wiring Harness (3) Wire Clamp (1) Plug High Limit Switch. (2) For EZ111DV/EZ98DV or NCC199CDV Plug 4 Freeze Prevention Heaters, Fan Motor, (3) Wire Clamp (NCC199CDV:1 Freeze Prevention Heater. ), (3) Wire Clamp Thermistor - Primary Heat Exchanger Outlet, Thermistor - Exhaust...
  • Page 22 Heat Exchanger Replacement Procedure Procedure Diagram (6) Only EZ111DV/EZ98DV or NCC199CDV Plug Thermistor. (7) Only EZ111DV/EZ98DV or NCC199CDV Plug remote control connector. (8) Plug Flame Rod. e.g. EZ111DV (9) Hook Flame Rod to the Wire Clamp. e.g. EZ111DV e.g. EZ111DV 20.
  • Page 23: Enlarged View

    Heat Exchanger Replacement Procedure Procedure Diagram 21. Attach Circuit Board (1) Attach Circuit Board with the screws(M4×12)*. * EZ111DV/EZ98DV or NCC199CDV: 3 screws NRCB199DV/NRCB180DV: 2 screws NRCB199DV/NRCB180DV EZ111DV/EZ98DV or NCC199CDV Enlarged view Put into the hole 22. Attach Front Cover EZ111DV/EZ98DV or NCC199CDV (1) Attach Front Cover with 4 screws w/ washer(M4×12).