Table 2-1 General Requirements for Anti-Interference Distance of Antennas
Scenario
Indoor
Installation
Scenario
For devices with built-in antennas, the distance required for deploying antennas is
the distance required for deploying devices.
Wall-mounted installation
The requirements for wall-mounted installation are as follows:
The installation on a wall requires mounting kits and expansion bolts. The
installation procedure is as follows:
When securing the sheet metal mounting bracket, ensure that the label
arrow in is up.
1.
2.
Issue 01 (2021-09-07)
radar stations, transmitting stations, and substations), unstable voltage, high
vibration, or strong noise.
Do not place the device horizontally.
Deployment distance requirements
● The distance between antennas is greater than 7 m.
● 5 m or more from the operator's 4G antenna
● Keep away from other electronic devices (such as
microwave ovens) that may cause antenna interference.
NO TE
● The wall must be able to withstand four times the total weight of the equipment and
sheet metal mounting kits without being damaged. When the total weight of the device
and sheet metal mounting kits is less than 1.25 kg, the wall must bear at least 50 N.
● When the tightening torque of the screws reaches 3.5 N·m, the screws will not fail to
rotate and the wall will not be cracked or damaged.
Place the sheet metal mounting kit against the wall, adjust the installation
position, and use a marker to mark anchor points, as shown in the following
figure.
Drill holes at the anchor points with a depth of 35 mm to 40 mm using a 6
mm electric drill bit, and install expansion coils to ensure that the expansion
coils are flush with the wall.