ABB COM600 4.0 Operation Manual page 21

Grid automation controller
Table of Contents

Advertisement

1MRS757279
Figure 3.7.3-4 Fault isolated
Grid Automation Controller COM600 4.0
FDIR Operation Manual
In the FDIR Control dialog, you can see a suggestion for load restoration, if you
have clicked Execute Isolation.
6. In the FDIR Mode tab, run the load restoration by clicking Excecute Restoration
if the suggestion is valid, or click Ignore.
Fault_isolated.PNG
21

Advertisement

Table of Contents
loading

Table of Contents