2 - 2
Assembly and installation
RPE group power
RPE installation
Installation and acceptance procedures
Table 2-1
NT and TELI (Sweden) packs
N T
QPC319
QPC320
QPC321
QPC322
QBL14 power distribution box
Power is distributed to RPE shelves (QSD21/QSD22) via the QBL14
located in a cabinet. The QBL14 unit is required at both local and
remote sites.
Table 2-2
Installation/removal procedures
Title
Local Site RPE Installation
Remote Site RPE Installation
RPE Circuit Pack Installation
RPE Circuit Pack Removal
Procedure 2-1
Local site RPE installation
.
1
Unpack and inspect the shelf. Refer to 553-YYY1-210
553-2931-200
TELI (Sweden)
TPC24
TPC25
TPC29
TPC26
Number
2-1
2-2
2-3
2-4
.
Need help?
Do you have a question about the Meridian SL-1 and is the answer not in the manual?
Questions and answers