After 24 Hours

After 24 hours of operating under load, the following services should
be performed.
1.
Check the unit for any unusual noise or vibration.
2.
Check the operating water level in the cold water sump. Adjust the
make up float valve if necessary.
3.
Readjust the belt tension.
4.
Inspect spray nozzles and heat transfer section.

Operation

During operation, the unit should be inspected, cleaned, and
lubricated on a regular basis, as per the 'Recommended Maintenance
Service Table' in this bulletin.