ABB Relion 650 Series Product Manual page 41

Breaker protection
Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

Breaker protection REQ650
Version 1.1 IEC
Secondary system supervision
Table 43. Current circuit supervision CCSRDIF
Function
Operate current
Block current
Table 44. Fuse failure supervision SDDRFUF
Function
Operate voltage, zero sequence
Operate current, zero sequence
Operate voltage, negative sequence
Operate current, negative sequence
Operate voltage change level
Operate current change level
Operate phase voltage
Operate phase current
Operate phase dead line voltage
Operate phase dead line current
Table 45. Breaker close/trip circuit monitoring TCSSCBR
Function
Operate time delay
Control
Table 46. Synchronizing, synchrocheck and energizing check SESRSYN
Function
Phase shift, j
- j
line
bus
Voltage ratio, U
/U
bus
line
Frequency difference limit between bus and line
Phase angle difference limit between bus and line
Voltage difference limit between bus and line
Time delay output for synchrocheck
Time delay for energizing check
Closing time for the circuit breaker
42
M12358-1 v4
Range or value
(5-200)% of I
r
(5-500)% of I
r
M16069-1 v5
Range or value
(1-100)% of UBase
(1–100)% of IBase
(1–100)% of UBase
(1–100)% of IBase
(1–100)% of UBase
(1–100)% of IBase
(1-100)% of UBase
(1-100)% of IBase
(1-100)% of UBase
(1-100)% of IBase
GUID-CF26761C-55B8-41EF-B140-651F7F116003 v2
Range or value
(0.020 - 300.000) s
M12359-1 v6
© Copyright 2011 ABB Power Grids. All rights reserved
Accuracy
± 10.0% of I
at I £ I
r
r
± 10.0% of I at I > I
r
± 5.0% of I
at I £ I
r
r
± 5.0% of I at I > I
r
Accuracy
± 1.0% of U
r
± 1.0% of I
r
± 0.5% of U
r
± 1.0% of I
r
± 5.0% of U
r
± 5.0% of I
r
± 0.5% of U
r
± 1.0% of I
r
± 0.5% of U
r
± 1.0% of I
r
Accuracy
± 0,5% ± 110 ms
Range or value
(-180 to 180) degrees
0.2 to 5.0
(0.003-1.000) Hz
(5.0-90.0) degrees
(0.000-60.000) s
(0.000-60.000) s
(0.000-60.000) s
1MRK 505 269-BEN B
IP11402-1 v1
IP11404-1 v2
Accuracy
-
-
± 2.0 mHz
± 2.0 degrees
± 0.5% of U
r
± 0.5% ± 25 ms
± 0.5% ± 25 ms
± 0.5% ± 25 ms
ABB Power Grids

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion req650

Table of Contents