Download Print this page

ABB Infinity S Quick Start Manual page 3

Aluminum bus system
Hide thumbs Also See for Infinity S:

Advertisement

QUICK START GUIDE
Step 4 - Connect Batteries and DC Output to Loads
The figure to the right shows the DC circuit of the system.
Battery connections are made directly to the battery bus or to bullet-style distribution positions on Panel A.
CAUTION: Verify battery voltage and polarity with a voltmeter before connecting.
Load connections are made to bullet-style distribution positions.
The distribution panel is equipped with 2 rows of 26 bullet-style distribution positions.
Top Row:
26 positions each selectable
(Panel A)
between battery and –48V load output.
Bottom Row:
26 positions each selectable between
(Panel B)
+24V load output and –48V load output.
+24V positions 1-13 (left) are noncritical
disconnected by the LVLD when operated.
Breakers up to 250A are available.
Turn breakers OFF before inserting.
Page 3
© 2021 ABB. All rights reserved.
Direct Battery Connections
GND
Rect 2
Rect 1
Rect 4
Rect 3
GND

Advertisement

loading

This manual is also suitable for:

Nes4824-23-ac5h-ps12-dc52a m-lvbd-lvld