Download Print this page

Huawei SUN2000L-2KTL Quick Manual page 23

Hide thumbs Also See for SUN2000L-2KTL:

Advertisement

Crimping Two Signal Cables
Connecting Signal Cables (to the Smart Power Sensors and Smart PV Safety Boxes)
Checking the Installation of SUN2000-(2KTL–6KTL)-L1 and
2.4
Powering On the SUN2000
See section 1.9 "Checking the Installation of SUN2000-(2KTL–6KTL)-L1 and Powering On the
SUN2000 ".
Commissioning SUN2000-(2KTL–6KTL)-L1
2.5
See section 1.10 "Commissioning SUN2000-(2KTL–6KTL)-L1".
Number of Signal Cables
22
Click

Advertisement

loading