Feed Installation; Feed Horn Assembly - Dawnco 1252 Series Manual

2.4m c & ku-band receive only
Table of Contents

Advertisement

DAWNco satellite products
[ 11, 12, 14 ]
[ 7, 8, 9 ]
SECTION 4
4.1

FEED HORN ASSEMBLY

Center Hub
[ 10 ]
Canister
Elevation Tabs
[ 6, 7 ]
Elevation Rod

FEED INSTALLATION

STEP 2:
Swing the reflector up until the hub can
be placed in between the top brackets
the canister. With the holes aligned,
secure the reflector with 1" hardware
( items 10, 11, 12 ).
STEP 3:
Raise or lower the reflector until you can
place the tube of the elevation adjustment
rod in between the two tabs on the center
hub. Secure in place with 1/2" hardware
( items 6, 7, 8, 9 ). Do not tighten these
bolts until section 5.1.
18
4096-356
2.4M Az/El TRUSS MOUNT

Advertisement

Table of Contents
loading

This manual is also suitable for:

1253 series

Table of Contents