DAWNco satellite products
3.3
REFLECTOR POSITIONING
[ 5, 7, 8 ]
Canister
Mast
Carton
STEP 1:
Bring the completed reflector assembly
to the pedestal and locate it about 1-1/2
to 2 feet away from the mast. Make sure
that the elevation brackets on the hub
are pointing away from the mast. Use
the reflector carton (or similar object) as
a rest for under the edge of the
reflector.
Be sure to have the 1" hardware close
at hand ( items10, 11, 12 ).
17
4096-356
2.4M Az/El TRUSS MOUNT
Elevation Brackets
on the Center Hub
Reflector Assembly