Feed Installation - Dawnco P37F Installation Manual

3.7m azel fixed, primfoc fibergl
Table of Contents

Advertisement

Elevation Rod
Assembly
[ 12, 13, 14, 15 ]
Center Hub
U-Bolt
[ 9, 10, 11 ]
SECTION 4
DAWNco • 3340 S. Lapeer Rd • Orion, MI 48359-1320 • Ph (248) 391-9200 • Fax (248) 391-9207 • sales@DAWNco.com
Elevation
Rod
Elevation Tabs
[ 7, 9, 10 ]

FEED INSTALLATION

3.4M & 3.7M Az/El TRUSS MOUNT
Attach the elevation rod assembly to
the elevation tab on the center hub with
5/8" hardware (items 12, 13, 14, 15) as
shown. Have the two U-bolts and 1/2"
hardware close at hand.
STEP 3:
A) Swing the reflector up until the cross
tube can be placed in the cradle of
the canister.
B) Raise the reflector's lower edge until
two persons can steady the reflector
in the cradle. Now the other installer
can secure the reflector to the canister
with the U-bolts and 1/2" hardware
(items 5, 9, 10, 11). Tighten hardware
to allow reflector to rotate in elevation.
C) Raise or lower the reflector until you
can place the elevation adjustment
block (item 2) between the two tabs
on the canister and secure with two
1/2" bolts, flatwashers and lockwashers
(items 7, 9, 10). Do not tighten these
bolts until section 5.1.
20
4096-225

Advertisement

Table of Contents
loading

Table of Contents