Master-Backup – Runs as a slave unit and monitors the operation of the stack master. If the
master unit fails, you must select the Master-Backup manually to assume the Stack-master
role. If a Master-Backup becomes the Master Unit, another Master-Backup will need to be
selected manually. One of the Slave units will not automatically become a Master-Backup.
Slave – Runs a slave version of the Switching Algorithm, which allows the applications
running on the master unit to control the resources of the slave unit.

Package Contents

Figure 1-1
shows the package contents of the NETGEAR Smart Switch.
Figure 1-1
Verify that the package contains the following:
NETGEAR Smart Switch
Rubber footpads for tabletop installation
Power cord
Rack-mount kit for installing the switch in a 19-inch rack
Installation guide
Smart Switch Resource CD with Smart Wizard Discovery and User's manual
Warranty/Support Information Card
1-4
v1.0, November 2006
Introduction

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs700ts series

Table of Contents