  • Page 1 INSTALLATION MANUAL OF DOUBLE GLASS MODULE For professional use only...
  • Page 2: Table Of Contents

    CONTENTS 1.0 GENERAL INFORMATION ................................3 1.1 INSTALLATION MANUAL DISCLAIMER ............................3 1.2 LIMITATION OF LIABILITY ................................3 2.0 SAFETY PRECAUTIONS .................................. 3 3.0 MECHANICAL / ELECTRICAL SPECIFICATIONS ........................... 4 4.0 UNPACKING AND STORAGE ................................. 5 5.0 MODULE INSTALLATION ................................7 5.1 MODULE WIRING ..................................
  • Page 3: General Information

    Before attempting to install, wire, operate es. This manual is valid for the bifacial double glass and/or service the module and other module types CS3W-PB-AG, CS3W-PB-AG (IEC1000V), C electrical equipment, all instructions should be read and S3W-PB-AG (IEC1500V), CS3W-MB-AG, CS3W-MB-AG (IE understood.
  • Page 4: Mechanical / Electrical Specifications

    Protective clothing (non-slip gloves, clothes, Test Conditions (STC) of 1000 W/m irradiance, with an etc.) must be worn during installation to AM1.5 spectrum, and a cell temperature of 25°C. Detailed prevent direct contact with 30 V electrical and mechanical characteristics of Canadian greater, and to protect hands from sharp Solar crystalline silicon PV modules can be found in edges.
  • Page 5: Unpacking And Storage

    guidance, where the minimum OCPD rating possible is  Modules should be stored in a dry and ventilated determined by calculating the expected maximum circuit environment to avoid direct sunlight and moisture. If current for the PV system, and the maximum OCPD rating modules are stored in an uncontrolled environment, constrained by the IEC 61215: 2016 and UL61730 standard the storage time should be less than 3 months and...
  • Page 6 module. Do not carry modules on your head.  Do not drop or place objects (such as tools) on the  modules. Do not use sharp instruments on the modules.  Do not leave modules unsupported or unsecured.  Do not stand, step, walk and/or jump on modules ...
  • Page 7: Module Installation

    number containing 14 digits or 16 digits. coverings in accordance with UL 61730 standard, with respect to meeting the same fire classification as the A nameplate is also affixed to the rear of each module. roof assembly. This nameplate specifies the model type, as well as the main electrical and safety characteristics of the module.
  • Page 8 modules to water (either fresh or salt, i.e. from  A maximum of two strings can be connected in parallel fountains, sea spray). without using an over-current protection device (fuses, etc.) incorporated in series within each string. Three or  Exposing modules to salt (i.e. marine environments) or more strings can be connected in parallel if an sulfur (i.e.
  • Page 9: Module Wiring

    the bypass diodes. This would void the module’s  Bifacial modules use direct, reflected, or diffuse warranty unless properly mitigated through the use of sunlight on the backside to generate additional power. Module Level Power Electronic (MLPE) devices. Therefore, bifacial modules are not suggested to be used in building attached photovoltaic systems (BAPV).
  • Page 10 Recommended wiring configurations Landscape installation two rows: CS3W/CS3Y/CS6W/CS7L/CS7N Cable length option = 1400 mm CS6R Cable length option = 1100 mm CS6RA Cable length option = 950 mm CS3W-PB-AG, CS3W-MB-AG, CS3Y-PB-AG, CS3Y-MB-AG, CS6R-H-AG, Note: Adjacent modules in the same row need to be rotated 180 degrees for proper installation.
  • Page 11 Note: Modules in adjacent rows need to be rotated 180 degrees for proper installation. Portrait installation one row Leap-frog (for single-axis tracker): CS3W/CS3Y Cable length = 1850 mm (+), 1850 mm (-) CS3W-PB-AG, CS6W Cable length = 2000 mm (+), 2000 mm (-) CS3W-MB-AG,...
  • Page 12: Grounding

    CORRECT CONNECTION OF CONNECTORS the use of a copper wire of at least 6 mm (10AWG) section.  Make sure that all connections are safe and properly mated. The PV connector should not be subject to stress  Only copper conductor material should be used. Select from the exterior.
  • Page 13: Mounting Instructions

    recommend using 4-14 mm² (AWG 6-12) copper wire. relevant hardware should be made of stainless steel, Holes provided for this purpose are identified with a unless otherwise specified. grounding symbol (IEC 61730-1). All conductive  Canadian Solar does not provide grounding hardware. connection junctions must be firmly fixed.
  • Page 14: Mounting Methods: Bolting

    professional structural engineer. of 4 points on two opposite sides.  Use appropriate corrosion-proof fastening materials.  M8 X 1.25 - Grade 8.8 (5/16”-18 Grade B7) galvanized or All mounting hardware (bolts, spring washers, flat A2-70 stainless steel bolt and nut should be used. washers, nuts) should be hot dip galvanized or stainless ...
  • Page 15 Module n method n method n method n method n method n method Types CS3W-MB-AG/ +5400Pa/ +3600Pa/ CS3W-PB-AG -2400Pa -2400Pa CS6R-H-AG/ +5400Pa/ +3600Pa/ CS6RA-H-AG -2400Pa -2400Pa CS3Y-MB-AG/ +5400Pa/ +3600Pa/ CS3Y-PB-AG -2400Pa -2400Pa +5400Pa/ CS6W-MB-AG(F42 **& F47*...
  • Page 16: Mounting Methods: Clamping

    6.2 MOUNTING METHODS: CLAMPING a) 80 mm (3.15 in) when 2400 Pa < uplift load ≤ 4000 Pa is required.  The mechanical load test with these mounting methods b) 40 mm (1.57 in) when uplift load ≤ 2400 Pa is were performed according to IEC 61215.
  • Page 17 6.2.1 Clamp mounting on long side of frame and rails perpendicularly to the long side frame Max Mechanical Load (Pa) Module Types +3600/-2400 +5400/-2400 +5400/-3600 A Range (mm) CS3W-MB-AG/CS3W-PB-AG 410-490 CS3Y-MB-AG/CS3Y-PB-AG 300-600 400-550 CS6R-H-AG 400-550 400-500 CS6RA-H-AG 300-450 350-400 CS6W-MB-AG(F42 **& F47* Frame)
  • Page 18 6.2.3 Clamp mounting on long side of frame and rails parallel to the long side frame. Max Mechanical Load (Pa) Module Types +2800/-2400 +3600/-2400 +4000/-3200 +4400/-3200 +4400/-3600 A1 Range (mm) CS3W-MB-AG/ 410-490 CS3W-PB-AG CS3Y-MB-AG/ 400-550 CS3Y-PB-AG CS6W-MB-AG(F42 **& F47* Frame) 400-500 CS6W-TB-AG 400-500 CS6RA-H-AG 300-400 CS7N-MB-AG (F43 Frame)**/...
  • Page 19 6.2.5 Six clamps on long side of frame and rails perpendicularly to the long side frame Max Mechanical Load (Pa) Module Types +5400/-2800 +6000/-3600 A3 & A5 Range (mm) CS6RA-H-AG 60-300 CS6R-H-AG 80-380 CS6W-MB-AG (F47 Frame)* 300-500 CS6W-MB-AG (F42 Frame)** 350-450 CS6W-TB-AG 300-500...
  • Page 20 6.2.7 Four clamp mounting on short side of frame. Max Mechanical Load (Pa) Module Types +2200/-2200 +2400/-2400 A2 Range (mm) CS6R-H-AG 20-200 200-250 6.2.8 Four clamp mounting on short side of frame, and an additional support bar placed below the center of the module.
  • Page 21: Insertion Systems

    3. Do not damage the surface of the frame. 6.3 INSERTION SYSTEMS 4. Ensure that the insertion profiles overlap the module  This mounting method has been certified by VDE and frame by at least 10 mm (0.39 in). CSA or qualified by Canadian Solar. 5.
  • Page 22: Mounting Methods (Single-Axis Tracker)

    (mm) (Pa) (mm) diameter location (mm) A1, A2, A3, A4 <65±5 +2400/-2400 CS3W-PB-AG A1-A3: 400 A1, A2, A3, A4 CS3W-MB-AG B1-B3: 1155 ≥65±5 +3000/-2800 B1, B2, B3, B4 A1, A2, A3, A4 <65±5 +2400/-1800 CS3Y-PB-AG A1-A3: 400...
  • Page 23 Tracker 1P Clamping method Clamp length C Test load Module type B Value (mm) (mm) (Pa) ≥40 +2400/-1800 CS3W-PB-AG ≥400 CS3W-MB-AG ≥80 +2400/-2400 CS3Y-MB-AG ≥400 ≥40 +1800/-1800 CS3Y-PB-AG CS6W-MB-AG(F42 ≥400 ≥40 +1800/-1800 Overlap width between clamp and **& F47* Frame)
  • Page 24: Maintenance

    procedure of Canadian Solar double glass photovoltaic  The maximum allowable twist angle of the module is 0.5 modules. The purpose of these cleaning guidelines is to degree. provide general information for cleaning Canadian Solar  Please contact the tracker manufacturer and Canadian modules.
  • Page 25 HANDLING NOTICE OPERATION PREPARATION  Noticeable dirt must be rubbed away by gentle cleaning implement (soft cloth, sponge or brush with soft  Use a proper cleaning solution and suitable cleaning bristles). equipment.  Ensure that brushes or agitating tools are not abrasive Do not use abrasive or electric cleaners on the ...
  • Page 26: Annex A: Guidance On Module Temperature For Several Locations

    ANNEX A: GUIDANCE ON MODULE TEMPERATURE FOR SEVERAL LOCATIONS  The operational temperature of a PV module changes module is installed (e.g. mounting distance to rooftop, during the day and also from day to day throughout the array size, array spacing and anti-nesting features), as year.
  • Page 27: Annex B: Coastal Area Anti-Corrosion Installation Guidelines

    ANNEX B: COASTAL AREA ANTI-CORROSION INSTALLATION GUIDELINES C.1.0: GENERAL INFORMATION  Please read this annex carefully and strictly follow any relevant instructions prior to installing Canadian Solar  According to the specific conditions stipulated in the modules in coastal areas. Failure to follow these Canadian Solar installation manual and general instructions and other general anti-corrosion principles warranty statement, Canadian Solar PV modules are...
  • Page 28 C.2.1: GENERAL ANTI-CORROSION METHODS metals or metals with a similar electrochemical potential. The metal’s coating also should be taken into  Do not scratch or break the corrosion-resistant coating account. There may be a big difference between the modules mounting systems during electrochemical potentials of two different coating...
  • Page 29 Follow the supplier’s general requirements when painting the three Painting interval coating layers. Apply the middle layer 24 hours after painting layer 1. Paint the air side layer 6 hours later after painting the middle layer. Clean the grounding components and make sure that they are dry and clean. The coating must cover all the grounding components and junction areas of the module frame or mounting General system.
  • Page 30 C.4.0: Precautions and General Safety Before installing any modules, contact C.5.0: LIMITATION OF LIABILITY  the appropriate authorities to obtain any  Canadian Solar shall not be held responsible for relevant approvals and learn of any site, damages of any kind, including, but not limited to, installation and inspection requirements.
  • Page 31: Amended Editions And Dates

    AMENDED EDITIONS AND DATES ·Rev 1.2 is released in June, 2019. ·Rev 1.21 is released in July, 2019. ·Rev 1.3 is released in September, 2019. ·Rev 1.4 is released in December, 2019. ·Rev 1.4 is released in December, 2019. ·Rev 1.5 is released in April, 2020. ·Rev 1.6 is released in May, 2020.