Fdap2 - Honeywell Field Device Access Point User Manual

Onewireless
Table of Contents

Advertisement

FDAP2

FDAP Gen3 Anchor Ethernet and field DC power
Fig. 15.
Item
1
2
3
The shield wire from cable must be secured on the chassis on the terminal power board.
For installations that require CE-mark compliance, the DC power source
must be a CE-mark approved power supply. In addition, the DC cable
between the approved DC power source must be no more than 3 meters
ATTENTION
(9.8 feet) from the FDAP Gen3 and FDAP Gen3 Anchor.
The FDAP2 has one Ethernet cable and one power cable. Ethernet interconnection is
limited to installations outside Class I Division 1, Zone 0/1 locations. You must construct
conduit and cable runs for power and Ethernet. The FDAP2 can be powered directly by
universal AC power supply or by external DC power supply such as distributed DC source.
Ensure that all wires inside the enclosure are routed and secured properly as displayed in
the following figures. The FDAP2 has integrated terminal blocks that allow field wiring to
OWDOC-X256-en-323A
Part number description
Table. 6.
Description
Cable gland assembly
Cable tie
Screw
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Field device access point gen3Field device access point gen3 anchorFdap2Fdap2 gen3Fdap2 gen3 anchor

Table of Contents