Gree GWH07AAAXA-K3NNA5A Service Manual page 86

Table of Contents

Advertisement

Service Manual
Step
6.Remove electric box assy
Loosen the connection clasps between
Cold plasma generator and electric
box, and then remove the cold plasma
a
generator.
① Cut off the wire binder and pull out the
indoor tube temperature sensor.
② Screw off one grounding screw.
③ Remove the wiring terminals of motor, cold plasma
generator and stepping motor.
④ Remove the electric box assy.
b
⑤ Screw off the screws that are locking each.
Rotate the electric box assy. Twist off the screws that
are locking the wire clip and loosen the power cord.
Remove the wiring terminal of power cord. Lift up the
main board and take it off.
C
Instruction:Some wiring terminal of this products is with
lock catch and other devices.The pulling method is as
below:
1.Remove the soft sheath for some terminals at first,
hold the circlip and then pull out the terminals,
2.Pull out the holder for some terminals at first(holder
is not available for some wiring terminal).hold the
connector and then pull the terminal.
Installation and Maintenance
Procedure
Shield cover of Electric
box
Indoor tube
Grounding
temperature sensor
screw
Wire binder
Screw
Power cord
Wire clip
Circlip
Soft sheath
Screws
clasps
Electric box
Step motor
Electric box assy
Main board
Wiring terminal
of motor
Wiring terminal
of stepping motor
Screw
Holder
Connector
83

Advertisement

Table of Contents
loading

Table of Contents