Siemens SINAMICS S120 Operating Instructions Manual page 8

Applications for cabinet modules, liquid-cooled
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Table of contents
2.6.12
Holder for ARC detector.........................................................................................................32
2.6.13
Main contactor for Line Connection Modules < 800 A...........................................................32
2.6.14
Auxiliary power generation in the Line Connection Module...................................................33
2.6.15
Insulation monitoring..............................................................................................................33
2.6.16
Cable-marshaling compartment 200 mm high.......................................................................33
2.6.17
Circuit breaker in withdrawable unit design............................................................................34
2.6.18
Fan power supply...................................................................................................................34
2.6.19
Measuring device for line supply variables............................................................................34
2.6.20
Measuring device for line supply variables with PROFIBUS connection...............................35
2.6.21
Motor reactor..........................................................................................................................35
2.6.22
Line connection from above...................................................................................................35
2.6.23
TM150 Temperature Sensor Module.....................................................................................36
2.6.24
Terminal Module TM54F........................................................................................................36
2.6.25
Safe Brake Adapter SBA 230 V AC.......................................................................................36
2.6.26
Closed cabinet door (air inlet from below through floor opening)...........................................37
2.6.27
IP21 degree of protection.......................................................................................................38
2.6.28
Degree of protection IP23......................................................................................................38
2.6.29
IP43 degree of protection.......................................................................................................38
2.6.30
IP54 degree of protection.......................................................................................................39
2.6.31
Contactor monitoring..............................................................................................................39
2.6.32
SMC10 Sensor Module..........................................................................................................39
2.6.33
SMC20 Sensor Module..........................................................................................................40
2.6.34
SMC30 Sensor Module..........................................................................................................40
2.6.35
SMC30 Sensor Module, additional.........................................................................................40
2.6.36
Base 100 mm high.................................................................................................................41
2.6.37
Anti-condensation heating......................................................................................................41
2.6.38
Current transformer upstream of the main switch..................................................................41
2.6.39
Voltage Sensing Module VSM10...........................................................................................41
3
Preparations for use...................................................................................................................................43
3.1
Requirements regarding the installation site..........................................................................43
3.2
Inspections when the equipment is received.........................................................................45
3.2.1
Checking the delivery.............................................................................................................45
3.2.2
Checking shock and tilt indicators..........................................................................................46
3.2.3
Checking the load handling attachments...............................................................................49
3.3
Transport................................................................................................................................49
3.3.1
Transport markings................................................................................................................49
3.3.2
Transport requirements..........................................................................................................50
3.3.3
Take the center of gravity into account..................................................................................50
3.3.4
Transport with a fork-lift truck.................................................................................................51
3.3.5
Transporting using a crane....................................................................................................51
3.3.6
Transporting transportation units packed in boxes................................................................54
3.3.7
Disassembling the crane transport assembly........................................................................55
3.4
Unpacking the cabinets..........................................................................................................56
3.4.1
Removing the packaging........................................................................................................56
3.4.2
Removing load securing devices...........................................................................................56
3.4.3
Lifting the cabinet units off the transport pallet and installing them........................................57
3.4.4
Checking the shock and tilt indicators inside the cabinet.......................................................57
3.5
Storage ..................................................................................................................................58
3.5.1
Emptying the drive.................................................................................................................58
8
Applications for Cabinet Modules, liquid cooled
Operating Instructions, 04/2015, A5E35974555A

Advertisement

Table of Contents
loading

Table of Contents