OPERATION AND MAINTENANCE
An
Company

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Synergy SwitchPak and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Acuity Brands Synergy SwitchPak

  • Page 1 OPERATION AND MAINTENANCE Company...
  • Page 2: Table Of Contents

    SPAK Operation SwitchPak - SPAK Contents Powering Up For The First Time ....................... 3 How Do I Program a Time Schedule Event to Control a Circuit? ..........4 Time Schedule Event Parameters ....................5 How Do I Enter Holiday Dates to be Used With Time Schedule Events?........6 How Do I Assign A Switch To Control A Circuit?................
  • Page 3: Powering Up For The First Time

    SPAK Operation SwitchPak - SPAK Powering Up For The First Time When the SwitchPak is initially powered up, you will be prompted to set the PHASE of the circuit feeding the power supply. The correct Phase must be selected if you intend to use the ZERO-CROSS SWITCHING feature of SwitchPak. If you are NOT using ZERO-CROSS SWITCHING, any phase can be selected.
  • Page 4: How Do I Program A Time Schedule Event To Control A Circuit

    SPAK Operation SwitchPak - SPAK How Do I Program a Time Schedule Event to Control a Circuit? SwitchPak uses schedule events to control one or more circuits (RELAYS). For each scheduled event, RELAYS can be selected to switch ON, OFF, or NO CHANGE, (not selected for event) eliminating the need to have both ON and OFF events at the same scheduled time.
  • Page 5: Time Schedule Event Parameters

    SPAK Operation SwitchPak - SPAK Time Schedule Event Parameters WHEN: (EVENT PARAMETERS) TIME – The time the event will occur. The time is displayed as HH:MM with an AM/PM indicator. Note: The system time must be correct for scheduled events to operate correctly. The system time setting is edited under SETTINGS, TIME/DATE.
  • Page 6: How Do I Enter Holiday Dates To Be Used With Time Schedule Events

    SPAK Operation SwitchPak - SPAK How Do I Enter Holiday Dates to be Used With Time Schedule Events? SwitchPak contains 32 holiday (calendar) dates for special occasions. Events occurring on holiday dates override any standard schedule events. Holiday dates are entered using the MM/DD/YY format. Once the holiday date(s) are programmed, use the HOLIDAYS button to assign programmed events to the holiday date.
  • Page 7: How Do I Assign A Switch To Control A Circuit

    SPAK Operation SwitchPak - SPAK How Do I Assign A Switch To Control A Circuit? SwitchPak can assign a switch (INPUT) to control one or multiple circuits (RELAYS.) This eliminates the need to rewire switches and loads if your control scheme changes. Switchpak contains eight inputs for switches, sensors or other dry contact closure devices.
  • Page 8: Switch Input Parameters

    SPAK Operation SwitchPak - SPAK Switch Input Parameters TYPES: MAINTAINED (2-wire SPST) – Terminated between ON and COM. Typically a standard wallswitch that is used in residential applications. A maintained switch can also be terminated between OFF and COM to provide an inverted output.
  • Page 9: How Do I Assign An Analog Photocell To Control A Circuit

    SPAK Operation SwitchPak - SPAK How Do I Assign an Analog Photocell To Control A Circuit? SwitchPak has one analog photocell input and can assign it to control one or multiple circuits (RELAYS.) SwitchPak can assign up to 8 different levels (set points) of photocell control, each set point being based on the amount of light the photocell is seeing.
  • Page 10: Photocell Parameters

    SPAK Operation SwitchPak - SPAK Photocell Parameters The photocell ON and OFF LEVELS use a 0 to 100 scale. 0 signifies the photocell does not see any light, 100 signifies the photocell is seeing the maximum footcandle amount it's calibrated for. Lithonia Analog Photocell Ratings: LSA APS IN (indoor) 0-100 FC...
  • Page 11: How Do I Calibrate The Photocell

    SPAK Operation SwitchPak - SPAK How Do I Calibrate the Photocell? SwitchPak's analog photocell input is desgned to work with a 0 - 10 volt photocell. Whenever the photocell sees the maximum footcandle amount it's rated for, it's output should be at 10 Volts. If the photocell is installed in a location where it does not receive enough light to cause it's output to operate in the entire 0 - 10 volt (0 - 100%) range, any photocell input programming based on a full range will not function correctly.
  • Page 12: How Do I Set Up A Relay For Different Load Types

    SPAK Operation SwitchPak - SPAK How Do I Set Up A Relay For Different Load Types? SwitchPak can configure it's RELAYS to control different load types. This eliminates the need to wire additional interfaces between the relay output and load to achieve the desired operation. All output circuits are terminated directly to one of the eight RELAY terminals.
  • Page 13: Relay Parameters

    SPAK Operation SwitchPak - SPAK Relay Parameters TYPES: NORMAL_OPEN The relay contacts are open when the relay is in the OFF state and closed when the relay is activated ON as indicated by the LED indicator on the relay button. This is the typical setting for most applications. NORMAL_CLOSED The relay function is inverted, which means the contacts are closed when the relay is in the OFF state and open when the relay is activated ON as indicated by the LED indicator on the relay button.
  • Page 14: How Do I Mask (Ignore) Inputs For Priority Control

    SPAK Operation SwitchPak - SPAK How Do I Mask (Ignore) Inputs For Priority Control? SwitchPak can setup a maximum of 25 INPUT MASKs. INPUT MASKING causes inputs to be ignored during the time period when the MASK is active. Masking is used to setup priority relationships between SCHEDULED EVENTS and INPUTS, or between multiple INPUTS.
  • Page 15: Input Masking Parameters

    SPAK Operation SwitchPak - SPAK Input Masking Parameters TIMES: Enter the start and ending time for each INPUT MASK. IGNORE OPTIONS: IGNORE ON’s Ignores ON commands from the selected INPUTS during the specified times. Example: A photocell input's ON event being MASKED (ignored) between 7 AM and 7 PM to prevent cloud cover from turning on the exterior lighting.
  • Page 16: How Do I Set The Time And Date

    SPAK Operation SwitchPak - SPAK How Do I Set the Time and Date? The current time and date must be correct for time schedule events to operate correctly. The flow diagram below shows the programming steps to set the time. START HERE SETTINGS...
  • Page 17: How Do I Check The Calculated Dawn And Dusk Times

    SPAK Operation SwitchPak - SPAK How Do I Check the Calculated Dawn and Dusk Times? The flow diagram below shows the programming steps to check the DUSK/DAWN TIMES START HERE SETTINGS DAWN/DUSK ’ ’ DIAGNOSTIC RESTORE DEFAULTS PRESS AND RELEASE PRESS AND RELEASE THE DOWN ARROW THE DOWN ARROW...
  • Page 18: How Do I Check The Firmware Version

    SPAK Operation SwitchPak - SPAK How Do I Check the Firmware Version? START HERE SETTINGS ABOUT ’ SwitchPAK ’ DIAGNOSTIC SWITCH STATUS Version SY20V101 PRESS AND RELEASE PHOTOCELL STATUS Oct 10 2003 08:51:06 THE DOWN ARROW [BACK] [OK] [BACK] [OK] [BACK] UNTIL DIAGNOSTIC...
  • Page 19: How Do I Check The Relay Status And Timeout Value

    SPAK Operation SwitchPak - SPAK How Do I Check the Relay Status and Timeout Value? SwitchPak can display each relay's status, ON or OFF, as well as the current timeout value (if there is one in effect) The flow diagram below shows the steps to check relay status. PRESS RELAY BUTTON(S) START...
  • Page 20: System Remote Operation

    SPAK Operation SwitchPak - SPAK System Remote Operation SwitchPak panels can be networked together to provide master schedules and inputs from one master panel to a maximum of 31 secondary panels. This is accomplished through a simple, unidirectional two-wire network, and requires no device addressing.
  • Page 21: How Do I Set Up Remote Inputs

    SPAK Operation SwitchPak - SPAK How Do I Set Up Remote Inputs? See the previous page for a detailed explanation of system remote operation. TIP! THE SYSTEM REMOTE MENU OPTION WILL NOT BE VISIBLE IF THE TRANSMIT/RECEIVE SWITCH IS NOT IN THE RECEIVE START POSITION...
  • Page 22: How Do I Restore The Factory Default Programming

    SPAK Operation SwitchPak - SPAK How Do I Restore the Factory Default Programming? You can erase all the user programming and return to the factory defaults. SwitchPak will give you a warning prompt to ensure you want to proceed, if you answer the warning prompt by pressing the OK key, all user programming will be lost. START HERE SETTINGS...