Inspection Upon Receipt Of Goods; General; Visible Damage; Concealed Damage - Mitsubishi Electric BC16 Installation, Operation & Maintenance Manual

Battery cabinet
Table of Contents

Advertisement

4. I
U
NSPECTION
PON
4.1 G
ENERAL
Special precautions and care have been taken to ensure the system arrives safe and undamaged.
However, upon receipt, you should inspect the entire shipment, including the crate and any boxes
for evidence of damage that may have occurred during transit.
4.2 V
D
ISIBLE
AMAGE
It is the responsibility of the person receiving the shipment to inventory and fully inspect all
materials against the bill of lading or weigh bill IMMEDIATELY while the carrier representative
is still present. Insure that all items are accounted for, including number of skids and quantity of
boxes. Also note any visible external damage that may have occurred during transit. Make all
applicable notations on the delivery receipt before signing and file a damage report with the
carrier.
4.3 C
D
ONCEALED
AMAGE
Within 3 to 30 days of receipt (depending on courier), unpack the system and check for any
concealed damage. Check the materials received against the detailed packing list to verify the
quantity and the condition as complete and satisfactory.
Note any damage to the internal packaging, then request an inspection by the carrier and file a
concealed damage claim. If there is a material shortage, contact a C&C Power representative at
the main office to file a claim.
Please contact your shipping company for all shipping damage.
C&C Power is not responsible for any shipping damage.
4.4 R
D
ETURN OF
AMAGED
Should equipment be damaged and require return to C&C Power for repair, a representative will
provide instructions along with an RMA number to expedite the return.
A RMA number must be obtained before returning equipment to C&C Power, Inc.
11/16/2011
R
G
ECEIPT OF
OODS
G
OODS
10
BC16 B
C
ATTERY
ABINET
755-00086 R02

Advertisement

Table of Contents
loading

Table of Contents