Download Print this page
NuTone ZB110H Installation Manual

NuTone ZB110H Installation Manual

Multi-speed ventilation fan with humidity sensor

Advertisement

Quick Links

READ AND SAVE THESE INSTRUCTIONS
Installer: leave this guide with homeowner.
Register your product online at www.broan.com/register.
Easy installation in both
new construction and retrofit
© 2012 Broan-NuTone LLC
ZB110H
X2 | Multi-Speed
Ventilation Fan
with Humidity Sensor
INSTALLATION GUIDE

Table of Contents

Warnings and Cautions
2
2
3
7
12
12
12
13
13

Advertisement

loading
Need help?

Need help?

Do you have a question about the ZB110H and is the answer not in the manual?

Questions and answers

Summary of Contents for NuTone ZB110H

  • Page 1: Table Of Contents

    Register your product online at www.broan.com/register. with Humidity Sensor INSTALLATION GUIDE Table of Contents Warnings and Cautions Typical Installation New Construction Installation Easy installation in both Retrofit Installation Operation new construction and retrofit Cleaning and Maintenance Troubleshooting Service Parts © 2012 Broan-NuTone LLC Warranty...
  • Page 2: Typical Installation

    Page 2 ZB110H Installation Guide WARNING CAUTION TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR . For general ventilating use only. Do not use to exhaust INJURY TO PERSONS, OBSERVE THE FOLLOWING: hazardous or explosive materials and vapors. 1. Use this unit only in the manner intended by the manufacturer.
  • Page 3: New Construction Installation

    Page 3 ZB110H Installation Guide New Construction Installation Tools needed Materials needed • Power screwdriver with a Phillips bit • 6" round metal ducting recommended for best performance. Use of other ducting is acceptable but may impact performance. • Phillips screwdriver •...
  • Page 4 Page 4 ZB110H Installation Guide New Construction Installation Snap-in and Secure Housing Position Housing between joists and crimp channel on both sides of Mounting Frame to lock Housing in place. Do not crimp Housing. Screws from Parts Bag Attach Duct Connector and Ducting...
  • Page 5 Page 5 ZB110H Installation Guide New Construction Installation Connect Wires and Install Knockout Plate • Run 120VAC electrical wiring to the installation location. • Use proper UL-approved connectors to secure wiring to the Knockout Plate provided in Parts Bag. • Connect wires as shown in wiring diagram.
  • Page 6 Page 6 ZB110H Installation Guide New Construction Installation Insert Mask and Finish Ceiling • Install ceiling material. • Cut out around Housing. Mask protects unit during construction. CAUTION Remove before installing Grille. IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE: If the blower was unplugged, power must be disconnected (see page 2, WARNING item 2) before inserting motor plug into control assembly.
  • Page 7: Retrofit Installation

    Page 7 ZB110H Installation Guide Retrofit Installation Tools needed Materials needed • Power screwdriver with a Phillips bit • Ruler • Tape to seal duct connections • Phillips screwdriver • Pencil • Existing rigid duct will require the addition of a short length of flexible duct •...
  • Page 8 Page 8 ZB110H Installation Guide Retrofit Installation Remove Blower Assembly Set aside Blower Assembly Both sides Remove Wiring Panel Set aside Wiring Panel Set aside screw Insert Mounting Frame Remove screws from Mounting Frame Bend up and set aside four tabs...
  • Page 9 Page 9 ZB110H Installation Guide Retrofit Installation Secure Mounting Frame Screws set aside in Step 7 Snap-in Housing Pull existing wiring into Housing as it is inserted into Mounting Frame Attach Ducting and Duct Connector Screw from Parts Bag Pull existing...
  • Page 10 Page 10 ZB110H Installation Guide Retrofit Installation Install Knockout Plate, Connect Wires and Install Wiring Panel • Use proper UL-approved connectors to secure wiring to the Knockout Plate provided in Parts Bag. • Connect wires as shown in wiring diagram.
  • Page 11 Page 11 ZB110H Installation Guide Retrofit Installation Insert and Secure Blower Assembly CAUTION IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE: Power must be disconnected (see page 2, WARNING item 2) before inserting motor plug into control assembly. Screws from Parts Bag If ceiling repairs are needed, place Mask in Housing after Blower Assembly is secured.
  • Page 12: Operation

    Page 12 ZB110H Installation Guide To Set User-Adjustable Humidity Sensitivity** WARNING Before servicing or cleaning unit, Using a small, flat-blade screwdriver, carefully rotate switch power off at service panel and lock the service HUMIDITY adjustment until arrow points to desired disconnecting means to prevent power from being humidity level shown in percent relative humidity (%RH).
  • Page 13: Troubleshooting

    Page 13 ZB110H Installation Guide Service Parts Troubleshooting Before continuing, turn off power as previously noted in WARNING and CAUTION sections on the previous page. Symptom: Fan does not run. • Check for an open fuse or circuit breaker in building’s service panel.
  • Page 14: Warranty

    (c) describe the nature of any defect in the Fan or part. At the time of requesting warranty service, you must present evidence of the original purchase date. Broan-NuTone LLC, 926 West State Street, Hartford, WI 53027 (1-800-637-1453) www.broan.com If you must send the Fan or part to Broan, as instructed by Broan, you must properly pack the Fan or part—Broan is not responsible for damage in transit.
  • Page 15 Índice Advertencias y precauciones Instalación típica Instalación en una construcción nueva 17 Fácil instalación en construcciones Instalación de conversión Funcionamiento nuevas y en aplicaciones de conversión Limpieza y mantenimiento Resolución de problemas Piezas de servicio © 2012 Broan-NuTone LLC Garantía...
  • Page 16 Página 16 Guía de instalación del ventilador ZB110H ADVERTENCIA PRECAUCIÓN PARA REDUCIR EL RIESGO DE INCENDIOS, DESCARGAS 1. Solo para usarse como medio de ventilación general. No debe usarse ELÉCTRICAS O LESIONES PERSONALES, OBSERVE LAS para la extracción de materiales o vapores peligrosos o explosivos.
  • Page 17 Página 17 Guía de instalación del ventilador ZB110H Instalación en una construcción nueva Herramientas necesarias Materiales necesarios • Destornillador eléctrico con cabeza Phillips • Se recomienda utilizar conductos metálicos redondos de 6 pulg. (15.2 cm) para obtener un desempeño óptimo. Aunque el uso de otros sistemas •...
  • Page 18 Página 18 Guía de instalación del ventilador ZB110H Instalación en una construcción nueva Acople y fije la cubierta Coloque la cubierta entre las vigas y doble el canal a ambos lados del marco de montaje para fijar la cubierta en su lugar.
  • Page 19 Página 19 Guía de instalación del ventilador ZB110H Instalación en una construcción nueva Conecte los cables e instale la placa de agujero ciego • Tienda el cable eléctrico de 120 VCA hasta el lugar de la instalación. • Use conectores aprobados por UL para fijar el cableado a la placa de agujero ciego incluida en la bolsa de piezas.
  • Page 20 Página 20 Guía de instalación del ventilador ZB110H Instalación en una construcción nueva Inserte la cubierta protectora y finalice el cielo raso • Instale el material del cielo raso. • Recorte alrededor de la cubierta. La cubierta protege la unidad durante la PRECAUCIÓN...