® Your local RITE-HITE representative provides a Planned Maintenance Program (P.M.P.) which can be fitted to your ® specific operation. Call your local representative or the RITE-HITE Corporation at 414-355-2600. ® The RITE-HITE products in this manual are covered by one or more of the following U.S. patents: 4,744,121;...
RITE-HITE ® does not recommend any particular lockout device, but recommends the utilization of an OSHA approved device (refer to OSHA regulation 1910.147). RITE-HITE ® also recommends the review and implementation of an entire safety program for the Control of Hazardous Energy (Lockout/Tagout). These regulations are available through OSHA publication 3120.
Page 5
Rite-Hite ® RHE-300 Edge-O-Dock Leveler Installation Manual OTHER IMPORTANT OPERATIONAL SAFETY WARNINGS Always barricade the dock leveler at ground Never be under the dock leveler platform or lip level and dock level from any form of traffic without: when maintenance is required.
Page 6
® RHE-300 Edge-O-Dock Leveler Rite-Hite Installation Manual SAFETY DEVICES The operation handle also serves as a Never be under the dock leveler platform or lip maintenance strut preventing the leveler from without: rotating onto the maintenance personnel. • Installing the Maintenance Strut. See right.
Rite-Hite ® RHE-300 Edge-O-Dock Leveler Installation Manual INSTALLATION INSTRUCTIONS 2. The dock must be clean, straight, and free of protrusions. Adequately sized dock edge steel must be an integral part of the dock or a transition plate with face plate must be utilized.
Page 8
® RHE-300 Edge-O-Dock Leveler Rite-Hite Installation Manual LUBRICATION CHART Lip Hinge (Grease or Oil) Deck Hinge Pin (Grease) Spring Assembly (Grease or Oil) Lip Latch Handle (Grease or Oil) Socket Hinge Pin (Grease) Maintenance Strut Lip Stop Riser Faceplate (Grease)
® RHE-300 Edge-O-Dock Leveler Rite-Hite Installation Manual OPTIONAL HYDRAULIC POWER KIT INSTALLATION INSTRUCTIONS • The Edge of Dock Leveler must be properly • Post warnings and barricades at dock level installed prior to installation of the hydraulic and at drive level to indicate that work is...
Page 11
Rite-Hite ® RHE-300 Edge-O-Dock Leveler Installation Manual OPTIONAL HYDRAULIC POWER KIT INSTALLATION INSTRUCTIONS CONT. (E) Rue Ring (L) Lift Arm (D) Washer (E) Rue Ring (B) Clevis Pin (K) Motor Mount Bracket (C) Cylinder Bracket FIGURE 4 - LIFT ARM, CYLINDER BRACKET, AND MOTOR MOUNT PLACEMENT INSTALLATION PROCEDURES 4.
Page 12
® RHE-300 Edge-O-Dock Leveler Rite-Hite Installation Manual OPTIONAL HYDRAULIC POWER KIT INSTALLATION INSTRUCTIONS CONT. To Power To Power See Step #8 For Specifications On See Step #8 For Specifications On Fused Disconnect with Fused Disconnect with Lockout/Tagout Lockout/Tagout Device Device...
Page 13
Rite-Hite ® RHE-300 Edge-O-Dock Leveler Installation Manual OPTIONAL HYDRAULIC POWER KIT INSTALLATION INSTRUCTIONS CONT. Up Button (J) Control Box (H) Hydraulic Cylinder (K) Breather Cap (A) Clevis Pin (E) Rue Ring (D) Washer FIGURE 8 - FINAL INSTALLATION FINAL INSTALLATION PROCEDURES 9.
Product claimed to be defective and shall, at Rite-Hite's option, either (x) grant Rite-Hite or its agent access to Owner's premises for the purpose of repairing or replacing the Product or (y) return of the Product to the Rite-Hite, F.O.B.
Need help?
Do you have a question about the RHE-300 and is the answer not in the manual?
Questions and answers