Recognising And Repairing Of Mistakes; Notes On Product Liability; Notes On Disposal; Eu Declaratopm Of Conformity - Profi-pumpe INVERTER PUMP CONTROL 5 Operating Instructions Manual

5-2,2kw/5-5,5kw/5-7,5kw 400v/400v
Table of Contents

Advertisement

Available languages

Available languages

8 English

9. RECOGNISING AND REPAIRING OF MISTAKES

Problem
Possible cause
The pump
permanently
The system has leaks. Internal check
switches on and off
valve may leak
(Pump clocked)
1. No mains voltage present
2. Too much difference in height between
The pump will not
start
3. The pump is defective
4. Malfunction of the device
1. The system has greater leakages
The pump will not
2. Malfunction of the device
stop
3. Internal check valve is dirty

10. NOTES ON PRODUCT LIABILITY

We point out, that we are only liable for damages under the Product Liability Act, which are
caused by our units if no changes were made to the equipment. If repairs are carried out by
our authorized service, we are only liable if original spare parts and accessories were used.

11. NOTES ON DISPOSAL

Electro devices of our company, labeled with the symbol of the crossed trash bin,
are not permitted to be disposed in your household garbage. We are registered at
the German registration department EAR under the WEEE-No. DE79535656.This
symbol means, that you're not allowed to treat this product as a regular household
waste item – it has to be disposed at a recycling collection point of electrical de-
vices. This is the best way to save and protect our earth.
THANK YOU FOR YOUR SUPPORT!
12. EU DECLARATION OF CONFORMITY
The undersigned, Amur S.à r.l., 36, Rue de la Gare, L-5540 Remich, certifies that the product
named overleaf, namely Inverter Pumpensteuerung 5 as placed on the market, complies with the
relevant provisions listed below, the relevant EU harmonised directives and the EU standard for
safety. This declaration of conformity applies insofar as no modifications are made to the
product. The sole responsibility for issuing this declaration of conformity lies with the manufacturer.
The sole authorised person to keep the technical documents:
Amur S.à r.l. - 36, Rue de la Gare - L-5540 Remich
Low Voltage Directive (2014/35/EU)
EC Electromagnetic compatibility directive (2014/30/EU)
The following harmonized standards: EN 61800-5-1:2007+A1:2017; EN 62233:2008+AC:2008;
EN 61000-6-1:2019; EN 61000-6-3:2007+A1:2011+AC:2012; EN IEC 61000-3-2:2019;
EN 61000-3-3:2013+A1:2019; RoHS: 2011/65/EU
Signed for and on behalf of:
the device and a customer (taps)
Amur S.à r.l.
Remich, 12.01.2023
i.V. Dipl. Phys. Peter Neumüller
Technical Manager
Solution
Vent system
Check system to dripping pipes / faucets /
valves.
Check non-return valve in the unit for leaks
1. Check the electrical
connections
2. Reduce height difference
3. Contact a qualified technician
4. Contact the merchant
1. Check the system
2. Contact the seller
3. Pump + Rinse machine

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Psm01138vkPsm01139vkPsm01140vk

Table of Contents