Page 1
This Owner’s Manual contains instructions on the installation, operation, maintenance and warranty of the NanaWall WD66 Standard Wood Framed Folding System. This manual is to be used by the installer for installation and is to be kept by the Owner for reference. Replacement parts can be ordered directly through NanaWall Systems.
Page 2
Panels are pre-assembled with or without glass, ready to be attached to the installed frame. In most The installation of the WD66 System requires a working cases, all hinges, weather stripping, multiple locking, and knowledge and experience in the use of tools, equipment...
Page 3
NANAWALL WD66 OWNER’S MANUAL • Upper and lower running carriage sets – one set for from the bottom of the sill and not from the finished floor. each pair of folding panels. (An extra set for each pair Allowance must be made in height for the portion of the or multiple pairs of folding panels unhinged to a side sill that is below the measured opening.
Page 4
NANAWALL WD66 OWNER’S MANUAL If any anchorage or drain connection holes are made through these drain channels, make sure that they are properly sealed to prevent any water leakage. The open ends of these drain channels at each end of the sill should also be properly sealed.
Page 5
In general, the surface must be prepared by cleaning off RECOMMENDATIONS dust and any debris. With 180-220 grit sandpaper, sand NanaWall wood framed systems are shipped with a factory lightly and thoroughly all surfaces to be painted. Do not applied layer of a waterborn translucent coat of sand use steel wool or silicon carbide type sandpapers.
B. PANELS AND FOLDING HARDWARE INSTALLATION to the corner joints yet. C. FINAL STEPS DIAGRAM 1: WD66 EXAMPLE OF A 3 PANEL UNIT INWARD OPENING A. FRAME ASSEMBLY AND INSTALLATION It might be easier to drill the holes as described in Step A8 before assembling the frame.
Page 7
NANAWALL WD66 OWNER’S MANUAL DIAGRAM 2: WD66 SUGGESTED TYPICAL INSTALLATION Suggested Typical Installation drawings shown are very general and may not be suitable Drawings not to scale. for any particular installation. Product placement, fasteners, flashing, waterproofing, Details shown are subject to sealant, trim, and other details for specific surrounding conditions must be properly change without notice.
Page 8
NANAWALL WD66 OWNER’S MANUAL DIAGRAM 2: WD66 SUGGESTED TYPICAL INSTALLATION Drawings not to scale. Suggested Typical Installation drawings shown are very general and may not be suitable Details shown are subject for any particular installation. Product placement, fasteners, flashing, waterproofing, to change without notice.
Page 9
18 gage (0.0451" thick) should have 1/4" Step A9 diameter type 410 stainless steel self drilling screws. Into For the top-hung WD66/o and for the floor supported structural steel substrates thicker than 1/4" should be pre WD66/u anchor the sill to the subfloor.
Page 10
Step B1 adjust the total width of the unit. On top-hung WD66/o insert all the upper running Step A11 carriages into the upper track, through the slot on As the sill is attached first, then the side jambs, now one end of the head jamb.
Page 11
NANAWALL WD66 OWNER’S MANUAL ILL. B1 ILL. B2 ILL. B3 Step B3 Step B7 Again, looking at the elevation drawing, attach the next For a running post at the end of a sequence of even panel needed to create a folding pair by aligning the number of panels or for unhinged paired panels, the upper hinges and inserting the proper hinge pins.
Page 12
Only a purpose of this is that the swing panel should always trained installer or with proper guidance from NanaWall be opened and engaged into the panel catch before should any adjustments be attempted. Please contact the folding panels are to be opened.
Page 13
NANAWALL WD66 OWNER’S MANUAL Step C9 Step C12 Seal the joints [A] on the exterior between the vertical To prevent uncontrolled movement of the panels when in jamb and the sill with exterior grade sealant. Therefore lift open position, place appropriate door holder by others the gasket, re-install and glue it afterwards.
Page 14
It is highly recommended that if not used, the NanaWall folding unit be kept closed as much as possible, in order to provide best security and weather resistance. When closed, please engage all locking mechanisms fully.
Page 15
NANAWALL WD66 OWNER’S MANUAL OPERATING THE SL-MULTIPOINT LOCKING ON THE PRIMARY SWING PANEL LOCKING UNLOCKING Normal position Engaging Locking Unlocking Disengaging locking points (Note that this is not one motion operation. Key or thumbturn must be unlocked first.) Be sure to check that the door is locked.
Page 16
A unit with worn or damaged on the exposure of the NanaWall unit. Periodically components will compromise the performance level repaint or restain the wood as needed. Exposure...
Page 17
NANAWALL WD66 OWNER’S MANUAL See Finishing Recommendations in the Owner’s After washing, the surface should be rinsed Manual of the wood systems. thoroughly with clean water and allowed to dry. 9. All hardware, hinges and handles should be b. For cleaning, do not use abrasive household...
Page 18
Proper glass installation is critical, as, with the NanaWall each succeeding panel. This is necessary for the stability folding system, glass is a structural part of the panel.
Page 19
APPENDIX A NANAWALL WD66 OWNER’S MANUAL Adjust the thickness of the glass setting blocks such 3. Measure both the vertical and horizontal dimensions of the glass and the panel opening. Subtract the that the panel is slightly out of square. The upper vertical glass size from the vertical panel opening size.
Page 20
APPENDIX A NANAWALL WD66 OWNER’S MANUAL upper corner with the setting blocks it is okay. If not, then the lower and upper setting blocks thickness need to be adjusted. Panels have to be braced correctly for proper operation. DIAGRAM 1:...
Page 21
APPENDIX B NANAWALL WD66 OWNER’S MANUAL NANAWALL WD66 STANDARD WOOD FRAMED FOLDING SYSTEM (FL Product Approval # 39256 Anchorage Requirements) This product must be anchored as specified below NOTES Fastener installations shown on this sheet are capable of withstand the design wind pressures shown on the curves in the Florida Evaluation Report with appropriate factors of safety.
Page 22
May 1, 2022, to be installed in the United States (excluding territories) or Canada. NanaWall shall have no obligation to respond under this Warranty until receipt of proper notice of a claim and an opportunity to respond. Upon notice and confirmation by NanaWall of a condition covered under this Warranty, NanaWall will respond in good faith and in a timely manner as follows: TEN YEAR COVERAGE.
Screens. For a screen part (excluding the screen mesh) with a material or workmanship issue that substantially impairs the function of the screen, NanaWall will, at its option, (1) ship a replacement screen or (2) upon return by owner, repair the screen without charge.
Page 24
This Warranty may only be modified by a writing signed by an officer of NanaWall. Any action taken by NanaWall does not create a new warranty or extend the duration of the original product warranty. A failure by NanaWall to enforce a warranty provision shall not constitute a waiver barring subsequent enforcement.
Page 25
• Products or components not supplied by NanaWall; Products that have not been paid for in full; Products ordered in larger sizes or special configurations beyond NanaWall’s published specifications. Product with glass that is heavier than NanaWall specifications;...
Page 26
NanaWall Warranty Registration Must be filled out and returned to Nana Wall Systems, Inc., 100 Meadowcreek Drive, Corte Madera, CA 94925 within 30 days from date of purchase of the NanaWall in order for the limited warranty to become effective. ________________________...
Need help?