Mounting Variations (Mv) - novotegra Green roof East-west Mounting Instructions

Table of Contents

Advertisement

Middle and end clamp space requirement
13 mm

5.4 Mounting variations (MV)

MV1
Module position south-facing
MV2
Module position "butterfly" (east/west)
Änderungen vorbehalten. Abbildungen sind beispielhaft und können vom Original abweichen.
V4.2.1 – März 2022/TP,
Copyright novotegra GmbH
12 mm
End clamps may be installed flush with the rail end.
Push module completely onto the rail nut of the
middle clamps.
Middle clamp fastening torque 10Nm
End clamp fastening torque 8Nm
Heed the planning documents and position and
fasten the components accordingly. Further
installation steps the same as variation
east/west.
Heed the planning documents and position and
fasten the components accordingly. Further
installation steps the same as variation
east/west.
10

Advertisement

Table of Contents
loading

Table of Contents