Installation; Kit Contents; Installing The Hpe Tft7600 G2 Rackmount Keyboard Monitor Kvm - HPE TFT7600 G2 User Manual

Rackmount keyboard monitor kvm console
Table of Contents

Advertisement

Installation

Kit contents

Item
TFT7600 KVM Console
M6 screws
6-32 screws
HPE Adjustable Toolless Rails
Cable management arm, power adapter with brace rail
Lock plates
USB cables
PS2 cables
Video cable
Power cords
USB cable labels
This kit might contain extra hardware.
Installing the HPE TFT7600 G2 Rackmount
Keyboard Monitor KVM
Align the 1U Adjustable Toolless Rails with the holes marked on the rack, and snap them into place.
1.
Snap one end of the 1U Adjustable Toolless Rails into the retna rails.
a.
Extend the other half of the 1U Adjustable Toolless Rails to meet the appropriate rack depth, and
b.
snap them into place.
NOTE: If the 1U Adjustable Toolless Rails do not snap into place, be sure that they align with
the holes marked on the rack. The holes marked on the rack must be in the same location for
the front and rear of the rack.
Quantity
1
4
5
2
1
2
2
2
1
2
2
Installation 7

Advertisement

Table of Contents
loading

Table of Contents