Moving A Rack With The Hpe Tft7600 Kvm Console Installed - HPE TFT7600 G2 User Manual

Rackmount keyboard monitor kvm console
Table of Contents

Advertisement

Moving a rack with the HPE TFT7600 KVM Console
installed
When moving the TFT7600 KVM Console installed in a rack, Hewlett Packard Enterprise recommends
that you install the lock plates, included in your kit, on each side of the unit and rack.
To install lock plates:
Place the lock plate into the slot and rotate it back.
1.
Insert one M6 screw into the hole on the lock plate, securing the unit to the rack.
2.
Repeat steps 1 and 2 to install the other lock plate.
3.
Maintenance 20

Advertisement

Table of Contents
loading

Table of Contents