To verify there is sufficient space for the storage system, document your site's floor plan,
including the locations of:
Structural support columns and other immovable objects
Walls
All existing equipment, cabinets, racks, networking equipment, and other systems
Where the new storage system will be installed
Floor and electrical cutouts
Interconnecting cables and power cords, including lengths
Floor vents
The space requirements must take into consideration the total floor clearance required for the
storage system. This includes:
The space required by the equipment
Service clearance - the floor space required to access the storage system.
Additional space required to distribute the equipment weight on your computer room's
raised floor. The amount of additional space required depends on your floor load rating.
Additional space required to view the storage system LEDs on the front and rear panels.
Hitachi Virtual Storage Platform E590 and E790 Hardware Reference Guide
Chapter 5: Site preparation
Floor cutout and service clearance
32