Download Print this page

Toro 02710 Setup Instructions page 2

32rd mid-size rear-discharge deck
Hide thumbs Also See for 02710:

Advertisement

5.
Remove the wheels
6.
Remove the deck cover and the PTO
engagement linkage rod before lifting and
moving the rotary cutting deck into position
against the power unit
Figure 2
1. Lift points
Note:
Retain all removed parts for later
installation.
(Figure
1).
(Figure
2).
2
Installing the Cutting Deck
Parts needed for this procedure:
8
Bolt (3/8 x 1 inch)
8
Curved washer
8
Flange nut (3/8 inch)
Procedure
1.
Install 8 bolts (3/8 x 1 inch), curved washers,
and flange nuts to secure the rotary cutting deck
to the power unit as shown in
Important:
parallel to the mower deck +/- 0.5 degrees
before tightening the fixing bolts.
g237246
1. Bolt (3/8 x 1 inch)
2. Flange nut (3/8 inch)
Note:
Install the bolts and washers together
on the same side of the frame. The reversed
hardware installs with the bolt end and nut facing
outwards.
2.
Torque the bolts to 40 to 47 N·m.
3.
Screw the PTO engagement linkage rod into the
power unit bell-crank yoke and then connect the
other end to the assist arm and secure it with the
hairpin cotter
2
Figure
Ensure that the engine deck is
Figure 3
3. Curved washer
4. Reversed hardware
(Figure
4).
3.
g237289

Advertisement

loading

This manual is also suitable for:

0271102712