Download Print this page

Initial Setup Instructions - Eagle Pro EPB Series Instruction Manual

Hydraulic pumps

Advertisement

02

INITIAL SETUP INSTRUCTIONS

Visually inspect the pump for any shipping damage. If any damage is found, notify the carrier immediately.
Carrier is responsible for any damage that occurs during shipment.
2.1
Terminology
2.2
Filling The Oil Reservoir
For shipping safety, the pump has been shipped without hydraulic oil in the reservoir. Remove the pump
from the shipping carton and fill the reservoir with the provided hydraulic fluid.
First, remove the filler cap (A). Using a clean funnel, and the provided hydraulic fluid fill the reservoir.
The reservoir is full when the oil level covers the top oil level gauge (C) .
Once the oil reservoir is full replace the filler cap (A). and properly dispose of the hydraulic fluid
containers.
EAGLE PRO INDUSTRIAL TOOLS, INC.
A. OIL FILLER CAP
B. VENTILATION KNOB
C. OIL LEVEL MONITOR AND THERMOMETER
D. POWER SWITCH
E. PUSH BUTTON CONTROL SWITCH (if applicable)
F. CONTROL VALVE
G. PRESSURE GAUGE
H. RESERVOIR OIL PLUG
4
FORM NO. E09005 REV. A.

Advertisement

loading

This manual is also suitable for:

Epb-17 seriesEpb-50 seriesEpb-100 series