Install And Wiring This Product; Installation Of Plc Adaptor (Implementation); When Fixing This Product To The Din Rail; When A Fixing Bracket Is Used - Panasonic HD-PLC DA-PU100 Administrator's Manual

Plc adaptor
Hide thumbs Also See for HD-PLC DA-PU100:
Table of Contents

Advertisement

2.4 Install and Wiring this product

2.4.1 Installation of PLC adaptor (implementation)

Install individual PLC adaptors to the determined construction site.
When installing to the place sequentially from the master, you can install it while confirming the
PLC link state.
Notice
During installation work, do not allow foreign objects (wire scrap, concrete wall materials, etc.) to
get inside the equipment.
One PLC adaptor must be set as the master adaptor and the other PLC adaptor must be
registered as a terminal adaptor in the master adaptor.

2.4.1.1 When fixing this product to the DIN rail

Use the DIN rail lever (①) to secure it to the DIN rail (②).
DIN rail lever: When pulling out from the DIN rail, pull it in the direction of the arrow.

2.4.1.2 When a fixing bracket is used

Notice
The weight of this product is about 260 g. Please confirm in advance that there is sufficient
strength at the installation site.
Check the strength of the installation site for long-term use.
If the strength of the installation site is insufficient, install appropriate reinforcement material in the
installation location.
For the outline of this product, refer to "Dimensions" (page 65).
1. Set the fixing brackets (①②③) to the main body with screws (rear side)
2. Remove the terminal cover
3. Use the screw holes (3 places) to fix this product to the installation location.
For wiring, refer to "Connection of power supply" (page 20)
4. Attach the terminal cover.
DA-PU100 Series Administrator's Manual
19

Advertisement

Table of Contents
loading

Table of Contents