Operation - Glacier bay FP4F0005BL Installation And Care Manual

Pull-down kitchen faucet
Table of Contents

Advertisement

Available languages

Available languages

Installation (continued)
5
Attaching supply lines
Identify hot and cold water supply valves below
the sink. Connect and tighten the water supply
line nuts by using two adjustable wrenches
(avoid twisting or kinking).

Operation

1
Flushing and checking for leaks
Remove the spray head (B) from the faucet body (A).
Turn on the water supply.
Flush out any debris. Check for leaks.
Replace the spray head (B).
RED LINE
HOT
B
B
6
BLUE LINE
COLD
A
A

Advertisement

Chapters

Table of Contents
loading

Table of Contents