Sharp SJ-GC440V-BK Service Manual page 24

Hide thumbs Also See for SJ-GC440V-BK:
Table of Contents

Advertisement

SJGC480VSL
11) Insert Control harness to VR PWB ass'y.
12) Fix VR PWB ass'y to R-c box cover.
13) Insert Control knob to 12) ass'y.
14) Fix 13) ass'y with Waterproof tape.
15) Fix 14) ass'y with PWB sheet 55DR.
16) Fix Lamp ass'y to R lamp holder.
17) Fix 16) ass'y to 2 Screws.
18) Insert R-c box al sheet to R-c box cover.
After putting in two notches hole, bent it 90º.
19) Insert Lamp harness to 17) ass'y.
20) Fix 19) ass'y to R-c box cover.
21) Fix R-thermistor to R-c box cover.
Paper Tape
N-PE-F
(W20×60mm)
(T1×22×40)
R thermistor
D
Paper Tape
(W20×30mm)
Paper Tape
(W20×30mm)
Screw
R-c box cover
Discharge
sealer
Lamp harness
VR PWB
PWB sheet
ass'y
55DR
22) Stick Warning label to R-c box al sheet.
23) Stick Control label to R-c box cover.
24) Fix 23) ass'y with paper tape.
25) Insert 10) ass'y to 24) ass'y.
PWB sheet 55DR
VR PWB ass'y
(70×150mm)
Control knob
Control knob
R-c box al sheet
R lamp holder
Lamp ass'y
Control label
Warning
Tapping
label
screw
Control knob
Figure A-11
24
Insert of pin
PL process
N o t e
Pins should be insert surely,
and check by pulling it.
R-thermistor
R-c box
al sheet
R air guider a
R thermistor
R air guider b
R lamp
holder
Lamp
ass'y
R-c box cover
PWB sheet 55DR
VR PWB ass'y
(70×150mm)
Control knob
R-c box
al sheet

Advertisement

Table of Contents
loading

Table of Contents