1. Go through the ELVIS II setup procedure outlined in the QNET Setup Guide
2. Once completed, launch the Measurement & Automation Explorer software.
3. As illustrated in Figure 8.16, expand the Devices and Interfaces and NI-DAQmx Devices items and
select the NI ELVIS II device.
4. As shown in Figure 8.16, click on the Reset Device button.
5. Once successfully reset, click on the Self-Test button.
6. If the test passed, reset the ELVIS II (i.e. shut off the Prototyping Board switch and System Power
switch and turn them back on again). The Ready LED on the ELVIS II should now be lit.
Figure 8.16: Reseting and performing the self-test on the ELVIS II
QNET MYOELECTRIC- User Manual
v 1.0