10-Installation - Haier HW80-B16939S8 User Manual

Table of Contents

Advertisement

Available languages

Available languages

EN
10.1 Preparation
Take the appliance out of the packaging.
keep them out of childrens reach. While opening the package, water drops may be
seen on plastic bag and porthole. This normal phenomenon results from water tests
in the factory.
Note: Packaging disposal
Keep all packaging materials out of children´s reach and dispose them in an environmen-
tally friendly manner.
10.2 OPTIONAL: Install noise reduction pads
1.When opening the shrink package,you will find four
noise reduction pads.These are used for reducing
noise(Fig. 10-1).
. 2
L
y a
h t
e
w
a
h s
n i
g
hole pointing upwards, bottom side towards op-
3. Take out the noise reduction pads and remove the
double-sided adhesive protective film;paste around
the bottom; the noise reduction pads under the w-
ashing machine cabinet as shown in Figure 3(two
longer pads in position 1 and 3, two shorter pads in
position 2 and 4). Finally set the machine upright again.
10.3 Dismantle the transportation bolts
The transportation bolts are designed for clamping
anti-vibration components inside the appliance during
transportation to prevent inner damage.
1.
Remove all 4 bolts on the rear side and take out
plastic spacers (Fig. 10-2)(Fig. 10-3).
2.
Fill left holes with blanking plugs (Fig. 10-4)(Fig. 10-5).
m
a
h c
n i
e
d
o
w
n
o t
s t i

10-Installation

1.
s
d i
e
p ,
r o
- t
2.
10-1
3.
10-3
10-2
10-4
10-5
25

Advertisement

Table of Contents
loading

Table of Contents