2.5 Material Setup & Calibration
2.5.1

Solid Material Setup

Tap on the solid material icon
solid materials, and 9 application rates and a blast rate for each material.
Material Names:
Select name from list
Click to popup keypad
Enter to save
Solid Rates:
Setpoints for 9 conveyor
knob positions
Unit of Solid Rate:
Kg/km or Lb/mi
Cal Gate:
Gate position used for
material calibration
2.5.2
Solid Material Calibration – Manual or Readback Gate
1. Prepare a container to catch material discharged
2. Make sure that sufficient material in the hopper and the system is safe to run.
3. Press 'START' to proceed and follow the instruction on the screen
Note: Press "STOP" button to stop the process anytime during calibration.
STEP 1
Ensure system safe to run
Manual Gate:
Manually adjust gate &
enter the gate position
Readback Gate:
Manually adjust gate (no
need to enter)
Continue to next step
Stop to abort
to configure materials desired. It allows to set up to 4 different