Advertisement

Rinnai 3" or
4" PVC/CPVC
Concentric
Side Wall
Termination
Configuration
Rinnai 3" or
4" PVC/CPVC
Snorkel
Termination
Configuration
Rinnai 3" or
4" PVC/CPVC
Tee Side Wall
Termination
Configuration
Rinnai 3" or
4" PVC/CPVC
Low Profile
Termination
Configuration
VENTING INSTALLATION SEQUENCE
1. Install the water heater.
2. Determine the termination method—sidewall or
vertical, concentric or separate pipes, etc.
3. Determine proper location for wall or roof
penetration for each termination.
4. Install termination assembly as described in this
manual.
Table 8: Approved PVC/CPVC Vent Configurations
KB Series Manual
Rinnai 3" or 4"
PVC/CPVC
Concentric
Vertical
Termination
Configuration
Rinnai 3" or 4"
PVC/CPVC
Standard
upside down
"U" Vertical
Termination
Configuration
Rinnai 3" or 4"
PVC/CPVC Tee
Vertical Ter-
mination Con-
figuration
5. Install air and vent piping from water heater to
termination.
6.
Slope horizontal exhaust run towards the water heater
1/4 per foot. DO NOT slope combustion air pipe
towards unit. Be sure to dispose of condensate per
local codes.
7. Install pipe supports and brackets every 4 feet allowing
for movement from expansion or as per local code