Miele PUR 98 D Operating And Installation Instructions page 27

Ventilation system
Table of Contents

Advertisement

 Draw two intersecting lines on the
ceiling.
 For extraction mode:
- Lay the vent duct and feed it down
through the ceiling in the area shown.
A section of flexible vent duct
approx. 28" (700 mm) long is needed
between the ceiling and the
ventilation hood's vent socket.
 Lay the power cord and feed it down
through the ceiling in the area shown.
A power cord approx. 28" (700 mm)
long is needed between the ceiling
and the ventilation hood's power
connection.
Installation
27

Advertisement

Table of Contents
loading

Table of Contents