Installation And Initial Start Up; Safety Notes For Installation And Initial Start Up; Preparation; Installation - GCE druva PPLH0FT Instructions For Use Manual

Point of use regulator
Table of Contents

Advertisement

Available languages

Available languages

6. INSTALLATION AND INITIAL START UP

6.1. SAFETY NOTES FOR INSTALLATION AND INITIAL START UP

STAFF
Installation and initial start-up of the system may only be performed by qualifi ed sta .
EN

6.2. PREPARATION

UNPACKING
The system components should be removed from their packaging carefully and prudently.
Additional protective packaging should also be removed.
Check all components of damages from transport
DEPRESSURIZE
Depressurize components and purge with inert gas if necessary
Cut tubing with special tool; avoid contaminations (dirt, cuttings, etc.)
Check perfect condition of components and purity of connections

6.3. INSTALLATION

In most cases the line regulator is mounted with compression fi ttings. First remove the plastic caps from inlet
and outlet. The piping has to be inserted completely into the compression fi tting. Than screw the nut hand
tight. After that screw with a jaw spanner 1 ¼ turns tight. Connect the relief tubing the same way.
The line regulator is available with hose nozzle when maximum pressure is 15 bar. Due to conical form of the
nozzle the hose easily fi ts.
6.4. REQUIRED QUALIFICATIONS FOR INITIAL START UP AND CYLINDER
CHANGING
The test protocols from the piping according to tightness and if necessary, moisture and particles are
available
In process gas tubing is only standard gas (see 1.2)
The start-up is only realized by qualifi ed personal
Wear safety clothes according to regulations
Use spark-free tools and provide before installation
Before fi rst start-up check type label, if the component is suitable for the provided purpose (gas, pressure,
material, etc.)

6.5. INITIAL START UP

All requirements are fulfi lled as on point 6.4
Line regulator is depressurized, handwheel turned completely to left side
WARNING!
Make sure the line regulator are not exposed to pressure levels that exceed their respective permissible
nominal pressure.

6.5.1. FILL THE PROCESS GAS TUBING WITH PROCESS GAS

Adjust pressure with handwheel turning clockwise. Line Regulator is now in operation.
We recommend checking the pressure at pressure gauges on daily bases.

6.5.2. TAKING GAS SUPPLY OUT OF OPERATION

Close line regulator by turning the handwheel anti clockwise.
Depressurize tubing system!
Line regulator is now out of operation. Now reparation and/ or maintenance work could be done.

6.6. TESTS

After pressurizing check the function of line regulaor.
Check relief valve
16/44

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

PplheftPslh0ftPslheft

Table of Contents