Electrical (Pre-wired electrical assembly)

Electrical Assemblies are installed on the middle rack
frame of the following indoor racks for single point
electrical connection.
IMPORTANT: Refer to the Specifications sections in
this manual for electrical requirements.
INTERIOR MODELS AVAILABLE WITH
ELECTRICAL ASSEMBLIES:
4 Unit Electrical Assembly with (2)
20A, 125V, 2-Pole, 3 Wire
Grounding Receptacles.
TRS03ILW
TRS03IL
TRS36
TRS46
6 Unit Electrical Assembly with
(3) 20A, 125V, 2-Pole, 3 Wire
Grounding Receptacles.
TRS05
TRS06
WARNING
Shut off building supply power prior to connecting to
TRS electrical assembly. Failure to do so may result
in property damage, bodily harm, or death.
TRS03
TRS04
White
(Neutral)
1. Locate gang box on side of TRS frame.
2. Remove the 2 screws securing front panel to gang
box.
3. Remove front panel.
4. Run building supplied electrical wiring and conduit
to gang box.
5. Connect building wiring to the 3 12AWG, THHN
wires, Hot (Black), Neutral (White), and Ground
(Green).
6. Reinstall front panel to gang box using 2 screws.
40
Conduit
Punch-out
Green
(Ground)
Black
(Hot)
Rinnai Rack Installation