Download Print this page

Toro Grandstand 78525 Installation Instructions Manual page 8

48in, 52in, or 60in blower and drive kit

Advertisement

4.
Loosely install the 3 nuts to the studs
Leave a clearance of 5 mm (3/16 inch) between
the nut and sheave.
Figure 8
1. Nut
(Figure
g302412
2. Stud
8).
5.
Install the sheave assembly to the spindle using
the washer and top nut
1. Top nut
2. Washer
6.
Torque the top nut to 176 to 217 N∙m (130 to
160 ft-lb).
Note:
Ensure that the sheave spins freely.
8
(Figure
9).
Figure 9
3. Sheave assembly
4. Spindle
g302413

Advertisement

loading

This manual is also suitable for:

Grandstand 78526Grandstand 78527