ABB HT586028 Operation Manual page 55

Table of Contents

Advertisement

Operation Manual / TPL76-C
5 Maintenance / 5.3 Cleaning the compressor during operation
5.3.2 Wet cleaning using external water-pressure vessel
Operating the water pres-
sure vessel
© Copyright 2018 . All rights reserved.
(XC3)
Operating state prerequisites for compressor cleaning with XC3
In order to carry out a successful cleaning procedure that has been
tested and is recommended by ABB Turbo Systems, the following pre-
requisite must be met:
Engine load 50 ... 85%
w
Start cleaning cycle according to following description Wet cleaning
u
operation with XC3.
Operating procedure for compressor wet cleaning with XC3
The operating state prerequisites for compressor cleaning with XC3
u
must be fulfilled.
Remove sealing plug (X).
u
Fill vessel with required volume of clean water (see table Cleaning
u
parameters).
Screw in sealing plug (X).
u
Push the valve activator (Y) against the spring and hold it for 10 ... 15
u
seconds until the entire volume of water has been injected.
HZTL2485_EN
Revision F
April 2018

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpl76-c35

Table of Contents