Texas Instruments LM5013-Q1EVM User Manual
Texas Instruments LM5013-Q1EVM User Manual

Texas Instruments LM5013-Q1EVM User Manual

Hide thumbs Also See for LM5013-Q1EVM:

Advertisement

Quick Links

www.ti.com
User's Guide
LM5013-Q1EVM User's Guide
The LM5013-Q1EVM has a 100-V DC/DC buck regulator that employs asynchronous rectification and achieves
high conversion efficiency. The EVM operates over a wide input voltage range of 15-V to 100-V to provide a
regulated 12-V output at 300-kHz switching frequency. The module design uses the LM5013-Q1 asynchronous
buck converter with wide input voltage (wide V
MOSFET, cycle-by-cycle overcurrent protection, and precision enable. With AEC-Q100 grade 1 automotive
qualification, the LM5013-Q1 is rated to operate over a junction temperature range of -40°C to +150°C. The
LM5013-Q1 is available in an 8-pin SO PowerPAD
DC/DC solutions.
Use the LM5013-Q1 with
create a custom regulator design.
1 General TI High Voltage Evaluation User Safety Guidelines..............................................................................................
2
Overview..................................................................................................................................................................................4
Module..............................................................................................................................................5
Procedure........................................................................................................................................................5
3.2 Detailed Descriptions.........................................................................................................................................................
4
Schematic................................................................................................................................................................................8
Layout..............................................................................................................................................................................9
6 Bill of Materials.....................................................................................................................................................................
7 Performance Curves.............................................................................................................................................................
8 Revision History...................................................................................................................................................................
Figure 2-1. LM5013-Q1 Pin Configuration (8-Pin SO Package with PowerPAD, Top
Figure 2-2. LM5013-Q1 Buck Regulator Simplified Schematic...................................................................................................
Figure 3-1. LM5013-Q1 EVM Top View.......................................................................................................................................
Figure 5-1. Top Layer and Silkscreen Layer................................................................................................................................
Figure 5-2. Mid-Layer 1 Ground Plane........................................................................................................................................
Figure 5-3. Mid-Layer 2 Routing..................................................................................................................................................
Routing................................................................................................................................................9
Trademarks
PowerPAD
is a trademark of Texas Instruments.
All trademarks are the property of their respective owners.
SNVU754A - OCTOBER 2021 - REVISED NOVEMBER 2021
Submit Document Feedback
ABSTRACT
) range, wide duty-cycle range, integrated high-side power
IN
WEBENCH® Power Designer

Table of Contents

Converter.......................................................................................................................4
List of Figures
Schematic.....................................................................................................................................8
List of Tables
Copyright © 2021 Texas Instruments Incorporated
package to enable high density, low component count
LM5013-Q1 with
WEBENCH® Power Designer
View)........................................................4
=
1.5-A.............................................................................11
Table of Contents
to
10
11
12
LM5013-Q1EVM User's Guide
2
6
4
5
9
9
9
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LM5013-Q1EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments LM5013-Q1EVM

  • Page 1: Table Of Contents

    LM5013-Q1EVM User's Guide ABSTRACT The LM5013-Q1EVM has a 100-V DC/DC buck regulator that employs asynchronous rectification and achieves high conversion efficiency. The EVM operates over a wide input voltage range of 15-V to 100-V to provide a regulated 12-V output at 300-kHz switching frequency. The module design uses the LM5013-Q1 asynchronous...
  • Page 2: General Ti High Voltage Evaluation User Safety Guidelines

    While the EVM is energized, never touch the EVM or its electrical circuits as they could be at high voltages capable of causing electrical shock hazard. LM5013-Q1EVM User's Guide SNVU754A – OCTOBER 2021 – REVISED NOVEMBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 3 For safety, use of isolated test equipment with overvoltage and overcurrent protection is highly recommended. SNVU754A – OCTOBER 2021 – REVISED NOVEMBER 2021 LM5013-Q1EVM User's Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 4: Overview

    Figure 2-1. LM5013-Q1 Pin Configuration (8-Pin SO Package with PowerPAD, Top View) Figure 2-2. LM5013-Q1 Buck Regulator Simplified Schematic LM5013-Q1EVM User's Guide SNVU754A – OCTOBER 2021 – REVISED NOVEMBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 5: Lm5013-Q1 Evaluation Module

    LM5013-Q1 Evaluation Module 3 LM5013-Q1 Evaluation Module The LM5013-Q1EVM is configured to deliver 12-V at up to 3.5-A at a switching frequency of 300-kHz. As shown in LM5013-Q1EVM schematic, a type 3 ripple generation circuit is used to generate the appropriate voltage ripple on FB.
  • Page 6: Detailed Descriptions

    (R5) , of 1 MΩ using Equation 1.5 V 1.5 V ˜ ˜ 332k 1.5 V 6 V 1.5 V IN(on) LM5013-Q1EVM User's Guide SNVU754A – OCTOBER 2021 – REVISED NOVEMBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 7 This flag indicates whether the output voltage has reached its regulation level. LM5013-Q1 PGOOD is an open-drain output that is tied to V through pull-up resistor. SNVU754A – OCTOBER 2021 – REVISED NOVEMBER 2021 LM5013-Q1EVM User's Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 8: Schematic

    (< 30 V). LM5013-Q1EVM User's Guide SNVU754A – OCTOBER 2021 – REVISED NOVEMBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 9: Pcb Layout

    Top Layer and Silkscreen Layer through Bottom Layer Routing show the board layout for the LM5013-Q1EVM. The EVM offers resistors, capacitors, and test points to configure the output voltage, precision enable, and switching frequency. The 8-pin SO PowerPAD package offers an exposed thermal pad, which must be soldered to the copper landing on the PCB for optimal thermal performance.
  • Page 10: Bill Of Materials

    Chip Capacitor, 100 pF, +/- 10%, 50 V, -55 to 125 degC, C1005C0G1H101K050BA 0402 (1005 Metric), RoHS, Tape and Reel R1, R3 RES, 1.00, 0.5%, 0.1 W, 0603 RT0603DRE071RL LM5013-Q1EVM User's Guide SNVU754A – OCTOBER 2021 – REVISED NOVEMBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 11: Performance Curves

    Ensure the hot temperature identifiers are noticed on the PCB and care is taken in the handling of the PCB. SNVU754A – OCTOBER 2021 – REVISED NOVEMBER 2021 LM5013-Q1EVM User's Guide Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 12: Revision History

    Changes from Revision * (October 2021) to Revision A (November 2021) Page • Updated Section 4 ............................. • Updated Section 7 ............................11 LM5013-Q1EVM User's Guide SNVU754A – OCTOBER 2021 – REVISED NOVEMBER 2021 Submit Document Feedback Copyright © 2021 Texas Instruments Incorporated...
  • Page 13 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2022, Texas Instruments Incorporated...

Table of Contents