Download Print this page

Daikin RX18N5VL Removal Procedure page 21

Advertisement

Si001419E
Step
2
Remove the screw and
remove the four way
valve coil.
Remove the terminal
3
cover.
4
Remove the protection
bushing.
Disconnect the
5
compressor lead wires
and the overload
protector.
Removal Procedure
Procedure
Overload
Protection bushing
protector
Electronic Expansion Valve Coil / Four Way Valve
Four way
valve coil
(R20952)
Terminal cover
(R20953)
U (red)
V (yellow)
W (blue)
(R20954)
Points
19

Advertisement

loading