Download Print this page

Samsung M471A5244CB0 Handling Manual page 7

Advertisement

Proper Socketing Process
1. Socketing must be conducted before
turn-on.
2. Ensure that both latch ejectors of
connector are fully opened.
3. Grip the module edge side with both
hands. (avoid touching component area)
4. Align module to socket notch &
side guide.
7

Advertisement

loading

This manual is also suitable for:

M378a5244cb0-ctdM393a2k43cb2-cvf